EC Near Baldwin City Plant No 1 is a greenfield datacenter candidate site in Douglas County, Kansas, interconnecting through SPP. It screens at 60.6/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.
Site location
Get alerts
Track EC Near Baldwin City Plant No 1
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Douglas County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Douglas | Greenfield | — | — | 3.5 yrs | 62.6 |
| EC Coal Douglas County | Greenfield | — | — | 3.5 yrs | 62.3 |
| UNKNOWN119028 | Substation-Adjacent | 230 kV | 300 MW | 3.3 yrs | 61.7 |
| EC Coal Douglas County | Greenfield | — | — | 3.5 yrs | 61.7 |
| EC Near Baldwin City Plant No 1 | Greenfield | — | — | 3.5 yrs | 61.6 |
| UNKNOWN118095 | Substation-Adjacent | 230 kV | 300 MW | 3.3 yrs | 61.5 |
| EC Near Lawrence Energy Center | Greenfield | — | — | 3.5 yrs | 61.4 |
| EC Near Lawrence Energy Center | Greenfield | — | — | 3.5 yrs | 61.2 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.