TETON PROJECT

Federal Excess

Teton County, Idaho · WECC

DC Readiness
39.6
Limited / 100

TETON PROJECT is a federal excess datacenter candidate site in Teton County, Idaho, interconnecting through WECC. It screens at 39.6/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth74

Connectivity

Nearest IXPMontana Opticom
IXP distance122.4 mi

Site characteristics

Acreage17 ac
Former useReclamation and Irrigation

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterVentureData
DC distance25.6 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity8.61¢/kWh
Industrial electricity7.18¢/kWh
Cooling degree days500
Heating degree days6,400
Land price / acre$5,512

Incentive detail: Personal property tax exemption on computer equipment.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
25
Fiber connectivity12%
44
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
33
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Teton County, ranked by DC Readiness.

Sites near TETON PROJECT
SiteTypeVoltageCapacityQueue waitScore
TAP206874Substation-Adjacent138 kV100 MW2.0 yrs63.9
TAP204988Substation-Adjacent138 kV100 MW2.0 yrs63.6
FELTSubstation-Adjacent138 kV100 MW2.0 yrs62.1
TARGHEE TAPSubstation-Adjacent115 kV100 MW2.0 yrs61.6
TETONSubstation-Adjacent115 kV100 MW1.7 yrs59.5
CRYSTAL SPRINGSSubstation-Adjacent115 kV100 MW1.7 yrs59.3
DRUMMONDSubstation-Adjacent161 kV100 MW2.0 yrs59.2
UNKNOWN202286Substation-Adjacent161 kV100 MW1.7 yrs59.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen