Teton County, Idaho · WECC

DC Readiness
56.6
Good / 100

TAP204988 is a substation-adjacent datacenter candidate site in Teton County, Idaho, interconnecting through WECC. It screens at 56.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP204988
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPMontana Opticom
IXP distance122.2 mi
Fiber providers1
Fiber coverage72.1%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterVentureData
DC distance27.6 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity8.61¢/kWh
Industrial electricity7.18¢/kWh
Cooling degree days500
Heating degree days6,400
Land price / acre$5,512

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption on computer equipment.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP204988

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
56
Fiber connectivity12%
57
Energy cost10%
50
Water risk7%
44
Natural hazard6%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Teton County, ranked by DC Readiness.

Sites near TAP204988
SiteTypeVoltageCapacityQueue waitScore
DRUMMONDSubstation-Adjacent161 kV100 MW6.9 yrs57.7
FELTSubstation-Adjacent138 kV100 MW6.9 yrs56.5
TAP206874Substation-Adjacent138 kV100 MW6.9 yrs56.2
UNKNOWN201270Substation-Adjacent69 kV50 MW6.9 yrs54.4
UNKNOWN202286Substation-Adjacent161 kV100 MW6.9 yrs53.5
WILSON 1&2Substation-Adjacent161 kV100 MW6.9 yrs53.5
EAST JACKSON 1&2Substation-Adjacent138 kV100 MW6.9 yrs53.1
RAFTER JSubstation-Adjacent115 kV100 MW6.9 yrs52.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP204988, Teton County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.