EC Coal Walton County

Greenfield

Walton County, Florida · SERC

DC Readiness
53.2
Fair / 100

At a glance

EC Coal Walton County is a greenfield datacenter candidate site in Walton County, Florida, scoring 53.2/100 DC Readiness — 27th of 37 scored sites in the county. It sits in the SERC grid region, where interconnection has averaged 3.7 years from request to operation.

Power & interconnection

Utility commercial rate0.13¢/kWh

Speed to power

Interconnection outlookModerate
≈ 4.6 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait4.6 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPBluBroadband Shell Ave
IXP distance32.9 mi
Fiber providers12
Fiber coverage58.9%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance407.2 mi

Site characteristics

Site typeGreenfield
Land contactWalton County County Assessor
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands
Former usecoal adjacent

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index79.0 (avg 100)

Location context

Nearest datacenterBluBroadband Shell Ave
DC distance32.9 mi
Nearest rail3.2 mi
Nearest gas pipeline3.9 mi
Nearest fiber route50.7 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.66¢/kWh
Industrial electricity8.17¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$5,504

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Coal Walton County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC Coal Walton County compare with other sites in Walton County?

EC Coal Walton County ranks 27th of 37 scored candidate sites in Walton County. Its 53.2/100 is roughly in line with the county average of 54.8. It is roughly in line with the Florida average of 56.0 and roughly in line with the national average of 53.2.

Against the Florida average, its strongest sub-score is natural hazard (45 vs 43) and its weakest is fiber connectivity (51 vs 73). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC Coal Walton County to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is BluBroadband Shell Ave at 32.9 miles. 12 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is BluBroadband Shell Ave, 32.9 miles away.

What are the flood, water and hazard risks at EC Coal Walton County?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). WRI rates baseline water stress at 1.20 on a 0–5 scale. No mapped wetlands are recorded on the parcel. At the county level, FEMA's National Risk Index rates Walton County "Very High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
65
Fiber connectivity12%
51
Energy cost10%
89
Water risk7%
76
Natural hazard6%
45
Buildability7%
15
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
84
Gas pipeline2%
88
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Walton County, ranked by DC Readiness.

Sites near EC Coal Walton County
SiteTypeVoltageCapacityQueue waitScore
EC Near Portland (FL)Greenfield——3.7 yrs59.7
UNKNOWN120666Substation-Adjacent115 kV100 MW3.7 yrs58.6
UNKNOWN120717Substation-Adjacent115 kV100 MW3.7 yrs58.0
MIRAMARSubstation-Adjacent115 kV100 MW3.7 yrs57.9
EC Near Portland (FL)Greenfield——3.7 yrs57.1
TAP142885Substation-Adjacent115 kV100 MW3.7 yrs57.0
UNKNOWN120724Substation-Adjacent115 kV100 MW3.7 yrs56.9
FREEPORTSubstation-Adjacent115 kV100 MW3.7 yrs56.8

EC Coal Walton County: common questions

What is the DC Readiness score of EC Coal Walton County?

EC Coal Walton County scores 53.2/100 on the GridCensus DC Readiness scale, rated fair. It ranks 27th of 37 scored sites in Walton County. The Walton County average is 54.8 and the Florida average is 56.0.

What grid region is EC Coal Walton County in?

EC Coal Walton County is in the SERC region. Projects interconnecting there have averaged a 3.7-year wait from queue request to operation.

Is EC Coal Walton County in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

Who owns EC Coal Walton County?

Parcel records list the owner as Tiitf/Ag-Forestry & Gfwfc (private land).

How far is EC Coal Walton County from an internet exchange?

The nearest internet exchange facility is BluBroadband Shell Ave, about 32.9 miles away; 12 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC Coal Walton County, Walton County, FL”, https://gridcensus.com/datacenter-sites/florida/walton-county/ec-coal-walton-county-8a56f314 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Coal Walton County, Walton County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.