Skip to content
Gridcensus

EC Coal Hillsborough County

Greenfield

Hillsborough County, Florida · SERC

DC Readiness
58.0
Good / 100

At a glance

EC Coal Hillsborough County is a greenfield datacenter candidate site in Hillsborough County, Florida, scoring 58.0/100 DC Readiness — 134th of 278 scored sites in the county. It sits in the SERC grid region and the TAMPA ELECTRIC CO service territory, where interconnection has averaged 3.7 years from request to operation.

Power & interconnection

Utility commercial rate0.11¢/kWh
UtilityTAMPA ELECTRIC COinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 4.6 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait4.6 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPCentersquare Tampa (TPA1)
IXP distance9.1 mi
Fiber providers13
Fiber coverage87.8%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance397.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerAbuoleim Nasr S
Land contactHillsborough County County Assessor
Land owner typeprivate
Buildability5.0/100
Land cover (NLCD)Water
Former usecoal plant

Risk & environment

Environmental constraintModerate (40/100)
Flood zoneZone VE (SFHA)
Water stress (WRI)1.20
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score20/100
Construction cost index96.2 (avg 100)

Location context

Nearest datacenterCyxtera Tampa TP1
DC distance9.2 mi
Nearest rail0.9 mi
Nearest gas pipeline1.1 mi
Nearest fiber route32.5 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.80¢/kWh
Industrial electricity8.50¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$15,276

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Coal Hillsborough County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC Coal Hillsborough County compare with other sites in Hillsborough County?

EC Coal Hillsborough County ranks 134th of 278 scored candidate sites in Hillsborough County. Its 58.0/100 is roughly in line with the county average of 58.5. It is roughly in line with the Florida average of 56.0 and roughly in line with the national average of 53.2.

Against the Florida average, its strongest sub-score is fiber connectivity (92 vs 73) and its weakest is natural hazard (20 vs 43). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC Coal Hillsborough County to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Centersquare Tampa (TPA1) at 9.1 miles. 13 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Cyxtera Tampa TP1, 9.2 miles away.

What are the flood, water and hazard risks at EC Coal Hillsborough County?

The site is in FEMA flood zone VE, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding. WRI rates baseline water stress at 1.20 on a 0–5 scale. Mapped wetlands (National Wetlands Inventory) are present on the parcel. At the county level, FEMA's National Risk Index rates Hillsborough County "Very High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
65
Fiber connectivity12%
92
Energy cost10%
89
Water risk7%
81
Natural hazard6%
20
Buildability7%
5
Labor market4%
50
DC cluster4%
80
Land / acreage3%
55
Construction cost3%
70
Gas pipeline2%
96
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Hillsborough County, ranked by DC Readiness.

Sites near EC Coal Hillsborough County
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN120373Substation-Adjacent230 kV300 MW3.7 yrs68.7
F J GannonBrownfield—635 MW3.7 yrs68.4
STATE ROUTE 60Substation-Adjacent230 kV300 MW3.7 yrs67.6
11TH AVENUESubstation-Adjacent230 kV300 MW3.7 yrs67.5
JUNEAUSubstation-Adjacent230 kV300 MW3.7 yrs67.4
DAVISSubstation-Adjacent230 kV300 MW3.7 yrs67.3
EC Near Tampa Electric Co NA 2Greenfield——3.7 yrs67.2
UNKNOWN120416Substation-Adjacent230 kV300 MW3.7 yrs66.5

EC Coal Hillsborough County: common questions

What is the DC Readiness score of EC Coal Hillsborough County?

EC Coal Hillsborough County scores 58.0/100 on the GridCensus DC Readiness scale, rated good. It ranks 134th of 278 scored sites in Hillsborough County. The Hillsborough County average is 58.5 and the Florida average is 56.0.

Which electric utility serves EC Coal Hillsborough County?

TAMPA ELECTRIC CO (investor owned) holds the retail service territory that contains the site; its holding company is TECO ENERGY.

What grid region is EC Coal Hillsborough County in?

EC Coal Hillsborough County is in the SERC region. Projects interconnecting there have averaged a 3.7-year wait from queue request to operation.

Is EC Coal Hillsborough County in a flood zone?

The site is in FEMA flood zone VE, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding.

Who owns EC Coal Hillsborough County?

Parcel records list the owner as Abuoleim Nasr S (private land).

How far is EC Coal Hillsborough County from an internet exchange?

The nearest internet exchange facility is Centersquare Tampa (TPA1), about 9.1 miles away; 13 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC Coal Hillsborough County, Hillsborough County, FL”, https://gridcensus.com/datacenter-sites/florida/hillsborough-county/ec-coal-hillsborough-county-46afef18 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Coal Hillsborough County, Hillsborough County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.