DC Readiness
47.1
Fair / 100

At a glance

Fryingpan-Arkansas at 38.438, -105.331 is a federal excess datacenter candidate site in Fremont County, Colorado, scoring 47.1/100 DC Readiness — 40th of 66 scored sites in the county. It sits in the WECC grid region and the WAPA-- WESTERN AREA POWER ADMINISTRATION service territory, where interconnection has averaged 3.5 years from request to operation.

Power & interconnection

UtilityWAPA-- WESTERN AREA POWER ADMINISTRATIONfederal

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPT5@Colorado Springs
IXP distance37.9 mi
Fiber providers5
Fiber coverage20.9%

Site characteristics

Acreage400 ac
Buildable load (est.)~160–400 MWland-based
Former useReclamation and Irrigation

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterT5@Colorado Springs
DC distance37.9 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.33¢/kWh
Industrial electricity9.15¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$2,756

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Fryingpan-Arkansas

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Fryingpan-Arkansas at 38.438, -105.331 compare with other sites in Fremont County?

Fryingpan-Arkansas at 38.438, -105.331 ranks 40th of 66 scored candidate sites in Fremont County. Its 47.1/100 is roughly in line with the county average of 49.9. It is roughly in line with the Colorado average of 50.6 and about 11% below the national average of 53.2.

Against the Colorado average, its strongest sub-score is natural hazard (75 vs 74) and its weakest is fiber connectivity (53 vs 62). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Fryingpan-Arkansas at 38.438, -105.331 to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is T5@Colorado Springs at 37.9 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is T5@Colorado Springs, 37.9 miles away.

What are the flood, water and hazard risks at Fryingpan-Arkansas at 38.438, -105.331?

At the county level, FEMA's National Risk Index rates Fremont County "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
50
Fiber connectivity12%
53
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
67
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Fremont County, ranked by DC Readiness.

Sites near Fryingpan-Arkansas at 38.438, -105.331
SiteTypeVoltageCapacityQueue waitScore
WEST CANONSubstation-Adjacent230 kV300 MW3.5 yrs57.1
OZ FremontGreenfield——3.5 yrs57.0
EC Coal Fremont CountyGreenfield——4.3 yrs56.0
EC Near W N ClarkGreenfield——3.5 yrs55.3
EC Coal Fremont CountyGreenfield——3.5 yrs55.2
EC Coal Fremont CountyGreenfield——4.3 yrs55.2
EC Near W N ClarkGreenfield——3.5 yrs55.1
EC Near W N ClarkGreenfield——3.5 yrs54.9

Fryingpan-Arkansas at 38.438, -105.331: common questions

What is the DC Readiness score of Fryingpan-Arkansas at 38.438, -105.331?

Fryingpan-Arkansas at 38.438, -105.331 scores 47.1/100 on the GridCensus DC Readiness scale, rated fair. It ranks 40th of 66 scored sites in Fremont County. The Fremont County average is 49.9 and the Colorado average is 50.6.

Which electric utility serves Fryingpan-Arkansas at 38.438, -105.331?

WAPA-- WESTERN AREA POWER ADMINISTRATION (federal) holds the retail service territory that contains the site.

What grid region is Fryingpan-Arkansas at 38.438, -105.331 in?

Fryingpan-Arkansas at 38.438, -105.331 is in the WECC region. Projects interconnecting there have averaged a 3.5-year wait from queue request to operation.

How far is Fryingpan-Arkansas at 38.438, -105.331 from an internet exchange?

The nearest internet exchange facility is T5@Colorado Springs, about 37.9 miles away; 5 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Fryingpan-Arkansas at 38.438, -105.331, Fremont County, CO”, https://gridcensus.com/datacenter-sites/colorado/fremont-county/fryingpan-arkansas-aac4a7a9 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Fryingpan-Arkansas at 38.438, -105.331, Fremont County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.