OZ El Paso

Greenfield

El Paso County, Colorado · WECC

DC Readiness
61.2
Good / 100

OZ El Paso is a greenfield datacenter candidate site in El Paso County, Colorado, interconnecting through WECC. It screens at 61.2/100 DC Readiness and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPT5@Colorado Springs
IXP distance6.2 mi
Fiber providers16
Fiber coverage57.0%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance403.1 mi

Site characteristics

Site typeGreenfield
Parcel ownerRoyal Farm Inc
Parcel APN5407201006
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)3.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteTHE DIFF SHOP
Hazard sub-score65/100
Construction cost index91.2 (avg 100)

Location context

Nearest datacenterT5@Colorado Springs
DC distance6.2 mi
Nearest rail5.4 mi
Nearest gas pipeline7.3 mi
Nearest fiber route16.2 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.55¢/kWh
Industrial electricity9.26¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$2,688

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
33
Fiber connectivity12%
83
Energy cost10%
89
Water risk8%
61
Natural hazard8%
65
Buildability7%
100
Labor market4%
50
DC cluster4%
80
Land / acreage3%
51
Construction cost3%
74
Gas pipeline2%
77
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in El Paso County, ranked by DC Readiness.

Sites near OZ El Paso
SiteTypeVoltageCapacityQueue waitScore
South Plant (CO)Brownfield257 MW74.4
MIDWAYSubstation-Adjacent345 kV600 MW1.7 yrs70.9
UNKNOWN202239Substation-Adjacent230 kV300 MW1.7 yrs70.8
UNKNOWN202845Substation-Adjacent230 kV300 MW1.7 yrs70.8
TAP209761Substation-Adjacent230 kV300 MW1.7 yrs69.6
FRONT RANGE POWER PLANTSubstation-Adjacent230 kV300 MW1.7 yrs69.6
UNKNOWN202739Substation-Adjacent230 kV300 MW1.7 yrs69.4
MARTIN DRAKESubstation-Adjacent115 kV100 MW1.7 yrs69.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.