Washoe Project
Federal ExcessSierra County, California · CAISO
Washoe Project is a federal excess datacenter candidate site in Sierra County, California, interconnecting through CAISO. It screens at 41.5/100 DC Readiness and a 8.2 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Risk & environment
Location context
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Sierra County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| BORDERTOWN | Substation-Adjacent | 345 kV | 600 MW | 8.2 yrs | 52.4 |
| FORT SAGE | Substation-Adjacent | 345 kV | 600 MW | 6.9 yrs | 49.0 |
| Portola | Brownfield | 60 kV | 6 MW | 5.7 yrs | 46.0 |
| N. TRUCKEE | Substation-Adjacent | 120 kV | 100 MW | 8.2 yrs | 43.4 |
| San Luis Unit, CVP | Federal Excess | — | — | 8.2 yrs | 43.0 |
| Washoe Project | Federal Excess | — | — | 8.2 yrs | 42.9 |
| STAMPEDE DAM | Substation-Adjacent | 69 kV | 50 MW | 8.2 yrs | 42.9 |
| Washoe Project | Federal Excess | — | — | 8.2 yrs | 42.8 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Washoe Project, Sierra County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.