Skip to content
Gridcensus

University of California Santa Cruz

Brownfield

Santa Cruz, California · CAISO

DC Readiness
46.6
Fair / 100

University of California Santa Cruz is a brownfield datacenter candidate site in Santa Cruz, California, interconnecting through CAISO. It screens at 46.6/100 DC Readiness with a catalogued 3 MW of candidate capacity and a 5.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN300935
Substation distance1.8 mi
Substation voltage60 kV
Available capacity3 MW
LMP zoneCAISO_ZP26
Wholesale LMP$12.84/MWh
Utility commercial rate0.30¢/kWh
UtilityPACIFIC GAS & ELECTRIC CO.investor ownedrestrictive to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.0 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionCAISO
Queue depth227
Avg queue wait5.7 yrs
Recent queue wait3.0 yrs
Completion rate11%
Withdrawal rate89%

Connectivity

Nearest IXPEquinix SV1/SV5/SV10 - Silicon Valley, San Jose
IXP distance22.7 mi
Fiber providers10
Fiber coverage33.7%
Nearest cloud providerAWS
Nearest cloud regionus-west-1
Cloud region distance25.3 mi

Site characteristics

Site typeBrownfield
Land contactState Environmental Cleanup Program
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity
Former usegas
Existing capacity3 MW
Retirement date2013-07-01

Risk & environment

Environmental constraintModerate (55/100)
Flood zoneZone X
Water stress (WRI)3.80
Wetlands (NWI)Clear
Critical habitatPresent
Superfund nearbyPresent
Superfund siteUCSC KOSHLAND EHM
Hazard sub-score22/100
Construction cost index94.9 (avg 100)

Location context

Nearest datacenterEquinix SV10
DC distance22.6 mi
Nearest rail1.0 mi
Nearest gas pipeline6.2 mi
Nearest fiber route1.0 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity29.59¢/kWh
Industrial electricity22.82¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$38,401

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track University of California Santa Cruz

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
29
Speed to power20%
35
Fiber connectivity12%
65
Energy cost10%
52
Water risk7%
24
Natural hazard6%
22
Buildability7%
100
Labor market4%
50
DC cluster4%
75
Land / acreage3%
58
Construction cost3%
71
Gas pipeline2%
80
Tax incentive1%
0
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Santa Cruz, ranked by DC Readiness.

Sites near University of California Santa Cruz
SiteTypeVoltageCapacityQueue waitScore
MOSS LANDINGSubstation-Adjacent500 kV1,000 MW8.2 yrs59.4
Fort OrdBrownfield115 kV—8.2 yrs51.0
EC Near University of California Santa CruzGreenfield——5.7 yrs48.9
EC Near University of California Santa CruzGreenfield——5.7 yrs48.0
EC Near University of California Santa CruzGreenfield——5.7 yrs48.0
Marina Landfill GasBrownfield115 kV3 MW5.7 yrs47.5
ROB ROYSubstation-Adjacent115 kV100 MW8.2 yrs47.2
CAMP EVERSSubstation-Adjacent115 kV100 MW8.2 yrs47.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for University of California Santa Cruz, Santa Cruz is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.