Skip to content
Gridcensus

Xilinx San Jose

Brownfield

Santa Clara County, California · CAISO

DC Readiness
53.0
Fair / 100

Xilinx San Jose is a brownfield datacenter candidate site in Santa Clara County, California, interconnecting through CAISO. It screens at 53.0/100 DC Readiness with a catalogued 1 MW of candidate capacity and a 5.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationVASONA
Substation distance1.8 mi
Substation voltage230 kV
Available capacity1 MW
LMP zoneCAISO_NP15
Wholesale LMP$16.53/MWh
Utility commercial rate0.28¢/kWh

Speed to power

ISO / RTO regionCAISO
Queue depth480
Avg queue wait5.7 yrs
Recent queue wait3.0 yrs
Completion rate11%
Withdrawal rate89%

Connectivity

Nearest IXPSVTIX San Jose
IXP distance5.8 mi
Fiber providers18
Fiber coverage49.4%
Nearest cloud providerAWS
Nearest cloud regionus-west-1
Cloud region distance6.5 mi

Site characteristics

Site typeBrownfield
Parcel ownerXilinx, Inc.
Land contactState Environmental Cleanup Program
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity
Former usegas
Existing capacity1 MW
Retirement date2020-09-01

Risk & environment

Flood zoneZone D
Water stress (WRI)3.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteTRIPLE G INCORPORATED
Hazard sub-score42/100
Construction cost index147.6 (avg 100)

Location context

Nearest datacenterForescout Technologies, Inc.
DC distance4.9 mi
Nearest rail1.7 mi
Nearest gas pipeline7.2 mi
Nearest fiber route0.1 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity28.22¢/kWh
Industrial electricity21.85¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$13,303

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
42
Speed to power15%
38
Fiber connectivity12%
84
Energy cost10%
52
Water risk8%
24
Natural hazard8%
42
Buildability7%
100
Labor market4%
50
DC cluster4%
95
Land / acreage3%
58
Construction cost3%
27
Gas pipeline2%
77
Tax incentive2%
0
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Santa Clara County, ranked by DC Readiness.

Sites near Xilinx San Jose
SiteTypeVoltageCapacityQueue waitScore
METCALF 1Substation-Adjacent500 kV1,000 MW8.2 yrs59.6
SC 1 Data Center, Phase 2Brownfield60 kV2 MW5.7 yrs56.5
Extreme San IgnacioBrownfield115 kV1 MW5.7 yrs56.4
VASONASubstation-Adjacent230 kV300 MW8.2 yrs53.6
HICKSSubstation-Adjacent230 kV300 MW8.2 yrs53.6
SARATOGASubstation-Adjacent230 kV300 MW8.2 yrs53.6
OZ Santa ClaraGreenfield5.7 yrs53.3
EC Near Yahoo! - HQGreenfield5.7 yrs53.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Xilinx San Jose, Santa Clara County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.