Greenfield (UNKNOWN305697 - None)

Greenfield

La Paz County, California · WECC

DC Readiness
43.2
Fair / 100

Greenfield (UNKNOWN305697 - None) is a greenfield datacenter candidate site in La Paz County, California, interconnecting through WECC. It screens at 43.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 7.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN305697
Substation voltage220 kV
Available capacity100 MW

Speed to power

Interconnection outlookConstrained
≈ 8.3 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth227
Avg queue wait7.6 yrs
Recent queue wait8.3 yrs
Completion rate11%
Withdrawal rate89%

Connectivity

Nearest IXPStream Data Centers - Phoenix I
IXP distance88.8 mi
Fiber providers1
Fiber coverage38.2%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Extremely High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterDatacenter 00938592711
DC distance87.6 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_reduction)
Commercial electricity13.63¢/kWh
Industrial electricity10.56¢/kWh
Cooling degree days3,400
Heating degree days1,500
Land price / acre$2,604

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Government Property Lease Excise Tax (GPLET) for qualified facilities on government land.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (UNKNOWN305697 - None)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
37
Speed to power20%
43
Fiber connectivity12%
49
Energy cost10%
50
Water risk7%
16
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in La Paz County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN305697 - None)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN305616Substation-Adjacent500 kV1,000 MW3.5 yrs58.6
COLORADO RIVERSubstation-Adjacent500 kV1,000 MW7.6 yrs57.1
BLM Solar DLA: BrendaGreenfield—808 MW3.5 yrs55.7
UNKNOWN302270Substation-Adjacent345 kV600 MW3.5 yrs55.6
EAGLE EYESubstation-Adjacent230 kV300 MW3.5 yrs55.3
HARCUVARSubstation-Adjacent230 kV300 MW3.5 yrs54.3
NORTH HAVASUSubstation-Adjacent230 kV300 MW3.5 yrs53.9
BLACK MESASubstation-Adjacent230 kV300 MW3.5 yrs53.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Greenfield (UNKNOWN305697 - None), La Paz County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.