Pinal County, Arizona · WECC

DC Readiness
56.1
Good / 100

At a glance

LA CANADA is a substation-adjacent datacenter candidate site in Pinal County, Arizona, scoring 56.1/100 DC Readiness — 37th of 471 scored sites in the county. Its nearest substation is LA CANADA (0 mi, 138 kV). It sits in the WECC grid region and the TUCSON ELECTRIC POWER CO service territory, where interconnection has averaged 3.5 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.

Power & interconnection

Nearest substationLA CANADA
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityTUCSON ELECTRIC POWER COinvestor ownedmoderate to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth54
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPLogin Tucson
IXP distance8.7 mi
Fiber providers15
Fiber coverage54.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Extremely High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterLogin Tucson
DC distance8.7 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_reduction)
Commercial electricity13.27¢/kWh
Industrial electricity10.78¢/kWh
Cooling degree days3,400
Heating degree days1,500
Land price / acre$2,148

Regulatory climate

Restrictivestate posture · as of 2026-08

Sales-tax exemption suspended Jul 2026–Jun 2029; water constraints add scrutiny.

DC tax incentiveNo / suspended

Incentive detail: Government Property Lease Excise Tax (GPLET) for qualified facilities on government land.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track LA CANADA

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does LA CANADA compare with other sites in Pinal County?

LA CANADA ranks 37th of 471 scored candidate sites in Pinal County. Its 56.1/100 is about 13% above the county average of 49.5. It is about 16% above the Arizona average of 48.5 and roughly in line with the national average of 53.2.

Against the Arizona average, its strongest sub-score is power availability (58 vs 34) and its weakest is water (16 vs 17). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is LA CANADA to power, fiber and other datacenters?

The nearest mapped substation, LA CANADA, is about 0 miles away and operates at 138 kV. For connectivity, the nearest internet exchange facility is Login Tucson at 8.7 miles. 15 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Login Tucson, 8.7 miles away.

What are the flood, water and hazard risks at LA CANADA?

At the county level, FEMA's National Risk Index rates Pinal County "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
51
Fiber connectivity12%
82
Energy cost10%
50
Water risk7%
16
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Pinal County, ranked by DC Readiness.

Sites near LA CANADA
SiteTypeVoltageCapacityQueue waitScore
Copper Crossing Energy and Research CentBrownfield69 kV1,779 MW3.5 yrs69.5
BROWNINGSubstation-Adjacent500 kV1,000 MW3.5 yrs65.7
SAGUAROSubstation-Adjacent500 kV1,000 MW3.5 yrs63.8
ABELSubstation-Adjacent500 kV1,000 MW3.5 yrs63.0
DUKESubstation-Adjacent500 kV1,000 MW3.5 yrs62.3
TORTOLITASubstation-Adjacent500 kV1,000 MW3.5 yrs62.0
PINAL CENTRALSubstation-Adjacent500 kV1,000 MW3.5 yrs61.4
SCHRADERSubstation-Adjacent230 kV300 MW3.5 yrs60.8

LA CANADA: common questions

What is the DC Readiness score of LA CANADA?

LA CANADA scores 56.1/100 on the GridCensus DC Readiness scale, rated good. It ranks 37th of 471 scored sites in Pinal County. The Pinal County average is 49.5 and the Arizona average is 48.5.

What is the nearest substation to LA CANADA?

The nearest mapped substation is LA CANADA, about 0 miles away, at 138 kV. GridCensus catalogs 100 MW of candidate capacity for the site.

Which electric utility serves LA CANADA?

TUCSON ELECTRIC POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is UNS ELECTRIC INCORPORATED.

What grid region is LA CANADA in?

LA CANADA is in the WECC region. Projects interconnecting there have averaged a 3.5-year wait from queue request to operation.

How far is LA CANADA from an internet exchange?

The nearest internet exchange facility is Login Tucson, about 8.7 miles away; 15 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “LA CANADA, Pinal County, AZ”, https://gridcensus.com/datacenter-sites/arizona/pinal-county/la-canada-8b3724ed (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for LA CANADA, Pinal County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.