Colorado River Front Work & Levee System

Federal Excess

La Paz County, Arizona · MISO

DC Readiness
41.6
Fair / 100

Colorado River Front Work & Levee System is a federal excess datacenter candidate site in La Paz County, Arizona, interconnecting through MISO. It screens at 41.6/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityARIZONA PUBLIC SERVICE COinvestor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth170
Avg queue wait2.8 yrs

Connectivity

Nearest IXPStream Data Centers - Phoenix I
IXP distance135.4 mi
Fiber providers1
Fiber coverage38.2%

Site characteristics

Acreage173 ac
Buildable load (est.)~69–173 MWland-based
Former useFlood Control and Navigation

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Extremely High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterDatacenter 00938592711
DC distance134.4 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_reduction)
Commercial electricity13.63¢/kWh
Industrial electricity10.56¢/kWh
Cooling degree days3,400
Heating degree days1,500
Land price / acre$2,604

Regulatory climate

Restrictivestate posture · as of 2026-08

Sales-tax exemption suspended Jul 2026–Jun 2029; water constraints add scrutiny.

DC tax incentiveNo / suspended

Incentive detail: Government Property Lease Excise Tax (GPLET) for qualified facilities on government land.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Colorado River Front Work & Levee System

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
31
Fiber connectivity12%
53
Energy cost10%
50
Water risk7%
16
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
67
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in La Paz County, ranked by DC Readiness.

Sites near Colorado River Front Work & Levee System
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN305616Substation-Adjacent500 kV1,000 MW6.9 yrs57.7
COLORADO RIVERSubstation-Adjacent500 kV1,000 MW8.2 yrs55.0
UNKNOWN302270Substation-Adjacent345 kV600 MW6.9 yrs54.7
EAGLE EYESubstation-Adjacent230 kV300 MW6.9 yrs54.5
HARCUVARSubstation-Adjacent230 kV300 MW6.9 yrs53.4
BLM Solar DLA: BrendaGreenfield—808 MW5.7 yrs53.4
NORTH HAVASUSubstation-Adjacent230 kV300 MW6.9 yrs53.0
BLACK MESASubstation-Adjacent230 kV300 MW6.9 yrs52.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Colorado River Front Work & Levee System, La Paz County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.