Rokeby L&D Hydroelectric Project

Brownfield

Bloom Township, Morgan, Ohio · Rye Development

Legacy capacity
4
MW

Rokeby L&D Hydroelectric Project is a former hydro site in Bloom Township, Morgan, Ohio. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 4 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity4 MW
EIA plant ID#62426

Grid hookup & remediation

Nearest substation6.8 mi
OperatorRye Development
Operator addressTBD, Bloom Township, OH, 43756
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Rokeby L&D Hydroelectric Project, ranked by DC Readiness.

Candidate sites near Rokeby L&D Hydroelectric Project
SiteTypeStateCountyVoltageCapacityQueue waitScore
WATERFORD POWER, LLCSubstation-AdjacentOHAthens County345 kV600 MW3.2 yrs72.2
MUSKINGUM RIVERSubstation-AdjacentOHMorgan County345 kV600 MW3.2 yrs71.4
OHIO CENTRALSubstation-AdjacentOHMuskingum County345 kV600 MW3.2 yrs69.1
Greenfield (UNKNOWN151647 - KAMMER (765KV))GreenfieldOHMuskingum County765 kV1,000 MW3.2 yrs69.0
Greenfield (UNKNOWN151647 - KAMMER (765KV))GreenfieldOHGuernsey County765 kV1,000 MW3.2 yrs67.8
UNKNOWN158907Substation-AdjacentOHMuskingum County138 kV100 MW3.2 yrs67.7
TRIMBLESubstation-AdjacentOHAthens County138 kV100 MW3.2 yrs67.7
Greenfield (UNKNOWN151647 - KAMMER (765KV))GreenfieldOHMuskingum County765 kV1,000 MW3.2 yrs67.7

See all datacenter sites in Ohio

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Rokeby L&D Hydroelectric Project, Bloom Township, Morgan, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.