Skip to content
Gridcensus

Philo L&D Hydroelectric Project

Brownfield

Harrison, Muskingum, Ohio · Rye Development

Legacy capacity
3
MW

Philo L&D Hydroelectric Project is a former hydro site in Harrison, Muskingum, Ohio. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity3 MW
EIA plant ID#62427

Grid hookup & remediation

Nearest substation0.2 mi
Operator addressTBD, Harrison, OH, 43771
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Philo L&D Hydroelectric Project, ranked by DC Readiness.

Candidate sites near Philo L&D Hydroelectric Project
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Coal Guernsey CountyGreenfieldOHGuernsey County3.2 yrs62.5
EC Coal Muskingum CountyGreenfieldOHMuskingum County3.2 yrs61.8
EC Coal Morgan CountyGreenfieldOHMorgan County3.2 yrs61.6
OZ GuernseyGreenfieldOHGuernsey3.2 yrs60.9
EC Coal Noble CountyGreenfieldOHNoble County3.2 yrs60.6
EC Coal Coshocton CountyGreenfieldOHCoshocton County3.2 yrs60.5
EC Coal Coshocton CountyGreenfieldOHCoshocton County3.2 yrs60.5
EC Coal Washington CountyGreenfieldOHWashington County3.2 yrs60.0

See all datacenter sites in Ohio

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Philo L&D Hydroelectric Project, Harrison, Muskingum, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.