Lowell L&D Hydroelectric Project

Brownfield

Adams Township, Washington, Ohio · Rye Development

Legacy capacity
5
MW

Lowell L&D Hydroelectric Project is a former hydro site in Adams Township, Washington, Ohio. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 5 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity5 MW
EIA plant ID#62429

Grid hookup & remediation

Nearest substation4.3 mi
OperatorRye Development
Operator addressTBD, Adams Township, OH, 45744
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Lowell L&D Hydroelectric Project, ranked by DC Readiness.

Candidate sites near Lowell L&D Hydroelectric Project
SiteTypeStateCountyVoltageCapacityQueue waitScore
WATERFORD POWER, LLCSubstation-AdjacentOHAthens County345 kV600 MW3.2 yrs72.2
MUSKINGUM RIVERSubstation-AdjacentOHMorgan County345 kV600 MW3.2 yrs71.4
BELMONTSubstation-AdjacentWVPleasants County765 kV1,000 MW3.2 yrs68.7
WASHINGTON ENERGY FACILITYSubstation-AdjacentOHNoble County345 kV600 MW3.2 yrs68.5
TAP163634Substation-AdjacentOHNoble County138 kV100 MW3.2 yrs67.7
Greenfield (UNKNOWN151647 - KAMMER (765KV))GreenfieldOHBelmont County765 kV1,000 MW3.2 yrs67.5
Greenfield (BELMONT - MOUNTAINTEER)GreenfieldWVWood County765 kV1,000 MW3.2 yrs67.1
Greenfield (WATERFORD POWER, LLC - SPORN)GreenfieldOHMorgan County345 kV600 MW3.2 yrs66.9

See all datacenter sites in Ohio

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.