Dennings Point Landfill Solar
BrownfieldBeacon, New York
Dennings Point Landfill Solar is a former landfill site in Beacon, New York. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Dennings Point Landfill Solar — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Bowline Point | natural gas plant | 750 | 20.7 mi | — |
| Monroe Landfill Solar | former landfill site | 2 | 17.0 mi | cleanup_complete |
| Mount Kisco Landfill Solar | former landfill site | 1 | 24.2 mi | cleanup_complete |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Dennings Point Landfill Solar
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Dennings Point Landfill Solar, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| Bowline Point | Brownfield | NY | Rockland County | — | 750 MW | 4.9 yrs | 69.0 |
| RAMAPO | Substation-Adjacent | NY | Rockland County | 500 kV | 1,000 MW | 4.9 yrs | 67.9 |
| PLEASENTVILLE | Substation-Adjacent | NY | Westchester County | 345 kV | 600 MW | 4.9 yrs | 67.1 |
| MILLWOOD | Substation-Adjacent | NY | Westchester County | 345 kV | 600 MW | 4.9 yrs | 66.9 |
| DANSKAMMER | Substation-Adjacent | NY | Putnam County | 345 kV | 600 MW | 4.9 yrs | 66.1 |
| UNKNOWN129085 | Substation-Adjacent | NY | Putnam County | 345 kV | 600 MW | 4.9 yrs | 66.1 |
| E. FISHKILL | Substation-Adjacent | NY | Putnam County | 345 kV | 600 MW | 4.9 yrs | 66.1 |
| ROSETON | Substation-Adjacent | NY | Putnam County | 345 kV | 600 MW | 4.9 yrs | 66.0 |
Nearby internet exchanges
- TierPoint Hawthorne (fka Xand)Hawthorne, NY · 5 networks
- ColoHouse New YorkOrangeburg, NY · 4 networks
- CyrusOne NorwalkNorwalk, CT · 3 networks
- CyrusOne TotowaTotowa, NJ · 3 networks
See all datacenter sites in New York →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
Every site and score for Dennings Point Landfill Solar, Beacon, New York is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.