Mount Kisco Landfill Solar
BrownfieldMount Kisco, New York
Mount Kisco Landfill Solar is a former landfill site in Mount Kisco, New York. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Mount Kisco Landfill Solar — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Bowline Point | natural gas plant | 750 | 12.5 mi | — |
| Glenwood | natural gas plant | 228 | 26.2 mi | — |
| Waterside Power, LLC | oil plant | 70 | 14.5 mi | — |
| Bergen Generating Station | natural gas plant | 19 | 29.5 mi | — |
| Riverbay | oil plant | 6 | 23.5 mi | — |
| Montefieor Medical Center Moses Division | natural gas plant | 4 | 23.5 mi | — |
| Kensico | former hydro site | 3 | 8.4 mi | — |
| New Milford Gas Recovery | natural gas plant | 3 | 28.6 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Mount Kisco Landfill Solar
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Mount Kisco Landfill Solar, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| Bowline Point | Brownfield | NY | Rockland County | — | 750 MW | 4.9 yrs | 69.3 |
| SHORE RD | Substation-Adjacent | NY | Nassau County | 345 kV | 600 MW | 4.9 yrs | 68.6 |
| BERGEN | Substation-Adjacent | NJ | New York County | 345 kV | 600 MW | 3.8 yrs | 68.4 |
| NORTH BERGEN | Substation-Adjacent | NJ | New York County | 345 kV | 600 MW | 3.8 yrs | 67.3 |
| PLEASENTVILLE | Substation-Adjacent | NY | Westchester County | 345 kV | 600 MW | 4.9 yrs | 67.1 |
| UNKNOWN129188 | Substation-Adjacent | NY | Westchester County | 345 kV | 600 MW | 4.9 yrs | 67.1 |
| MILLWOOD | Substation-Adjacent | NY | Westchester County | 345 kV | 600 MW | 4.9 yrs | 66.9 |
| SPRAIN BROOK | Substation-Adjacent | NY | Bronx County | 345 kV | 600 MW | 4.9 yrs | 66.6 |
Nearby internet exchanges
- Digital Realty NYC (60 Hudson)New York, NY · 160 networks
- Equinix NY2/NY4/NY5/NY6 - New York, SecaucusSecaucus, NJ · 132 networks
- Digital Realty NYC (111 8th Ave)New York, NY · 131 networks
- 165 Halsey Meet-Me RoomNewark, NJ · 107 networks
See all datacenter sites in New York →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Mount Kisco Landfill Solar, Mount Kisco, New York. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.