Stony Brook

Brownfield

Ludlow, Hampden, Massachusetts · Massachusetts Mun Wholes Electric Co

Legacy capacity
422
MW

Stony Brook is a natural gas plant in Ludlow, Hampden, Massachusetts. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 422 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity422 MW
EIA plant ID#6081

Grid hookup & remediation

Nearest substation0.1 mi
Operator addressMoody Street, Ludlow, MA, 1056
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Hampden County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)170,676
IT / tech employment45
Construction employment7,877
Land value$13,611/acre

Power economics & interconnection

Commercial power rate16.80¢/kWh
Industrial power rate15.72¢/kWh
Load growth (FERC-714)0.4%

Water & cooling

Water stressLow
Public water supply45.4 MGD
Industrial water use1.0 MGD
Cooling degree days600
Mean annual temp49°F

Hazard, flood & connectivity

FEMA risk index22.0 · Relatively Low
Fiber providers10 · 32% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Stony Brook — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Cabot Holyokenatural gas plant265.1 mi—
Palmer Metropolitan Airfield Solarformer brownfield site610.2 micleanup_complete
Mount Tom Stationformer power_plant site66.8 micleanup_complete
Emery Street Landfillformer landfill site510.2 micleanup_complete
Former Parsons Paper Companyformer superfund site46.8 micleanup_complete
Cottage Street Landfillformer landfill site45.9 micleanup_complete
Belchertown Road Landfill Solarformer landfill site411.5 micleanup_complete
Hadley Fallsformer hydro site44.9 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Stony Brook

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Stony Brook, ranked by DC Readiness.

Candidate sites near Stony Brook
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN133485Substation-AdjacentMAHampden County345 kV600 MW3.9 yrs67.3
TAP136499Substation-AdjacentCTCapitol Planning Region345 kV600 MW3.9 yrs66.1
NORTH BLOOMFIELDSubstation-AdjacentCTCapitol Planning Region345 kV600 MW3.9 yrs65.6
BARBOUR HILLSubstation-AdjacentCTCapitol Planning Region345 kV600 MW3.9 yrs65.5
AGAWAMSubstation-AdjacentMAHampden County345 kV600 MW3.9 yrs64.2
LUDLOWSubstation-AdjacentMAHampden County345 kV600 MW3.9 yrs62.6
Indian Orchard Solar FacilityBrownfieldMAHampden—2 MW3.9 yrs60.4
UNKNOWN133287Substation-AdjacentCTCapitol Planning Region115 kV100 MW3.9 yrs59.9

Nearby internet exchanges

See all datacenter sites in Massachusetts →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Stony Brook, Ludlow, Hampden, Massachusetts. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.