Palmer Metropolitan Airfield Solar

Brownfield

Palmer, Massachusetts

Legacy capacity
6
MW

Palmer Metropolitan Airfield Solar is a former brownfield site in Palmer, Massachusetts. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 6 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer brownfield site
Site typeepa_brownfield
Existing capacity6 MW
Acreage30 ac

Grid hookup & remediation

Nearest substation1.8 mi
Cleanup statuscleanup_complete
Why this site is datacenter-attractive: a former brownfield site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Palmer Metropolitan Airfield Solar — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Stony Brooknatural gas plant42210.2 mi—
Cabot Holyokenatural gas plant2615.3 mi—
Mount Tom Stationformer power_plant site617.0 micleanup_complete
Emery Street Landfillformer landfill site50.0 micleanup_complete
Former Parsons Paper Companyformer superfund site417.0 micleanup_complete
Cottage Street Landfillformer landfill site412.7 micleanup_complete
Belchertown Road Landfill Solarformer landfill site415.7 micleanup_complete
Hadley Fallsformer hydro site415.1 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Palmer Metropolitan Airfield Solar

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Palmer Metropolitan Airfield Solar, ranked by DC Readiness.

Candidate sites near Palmer Metropolitan Airfield Solar
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN133485Substation-AdjacentMAHampden County345 kV600 MW3.9 yrs67.3
TAP136499Substation-AdjacentCTCapitol Planning Region345 kV600 MW3.9 yrs66.1
BARBOUR HILLSubstation-AdjacentCTCapitol Planning Region345 kV600 MW3.9 yrs65.5
AGAWAMSubstation-AdjacentMAHampden County345 kV600 MW3.9 yrs64.2
LUDLOWSubstation-AdjacentMAHampden County345 kV600 MW3.9 yrs62.6
CARPENTER HILLSubstation-AdjacentMAWorcester County345 kV600 MW3.9 yrs62.5
Indian Orchard Solar FacilityBrownfieldMAHampden—2 MW3.9 yrs60.4
Greenfield (LUDLOW - BARBOUR HILL)GreenfieldCOHampden County345 kV600 MW6.9 yrs59.9

Nearby internet exchanges

See all datacenter sites in Massachusetts →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Palmer Metropolitan Airfield Solar, Palmer, Massachusetts. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.