Northampton Landfill Solar
BrownfieldNorthampton, Massachusetts
Northampton Landfill Solar is a former landfill site in Northampton, Massachusetts. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Northampton Landfill Solar — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Stony Brook | natural gas plant | 422 | 12.2 mi | — |
| Cabot Holyoke | natural gas plant | 26 | 9.4 mi | — |
| Palmer Metropolitan Airfield Solar | former brownfield site | 6 | 20.9 mi | cleanup_complete |
| Mount Tom Station | former power_plant site | 6 | 8.1 mi | cleanup_complete |
| Emery Street Landfill | former landfill site | 5 | 20.9 mi | cleanup_complete |
| Former Parsons Paper Company | former superfund site | 4 | 8.1 mi | cleanup_complete |
| Cottage Street Landfill | former landfill site | 4 | 16.1 mi | cleanup_complete |
| Belchertown Road Landfill Solar | former landfill site | 4 | 9.0 mi | cleanup_complete |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Northampton Landfill Solar
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Northampton Landfill Solar, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN133485 | Substation-Adjacent | MA | Hampden County | 345 kV | 600 MW | 3.9 yrs | 67.3 |
| AGAWAM | Substation-Adjacent | MA | Hampden County | 345 kV | 600 MW | 3.9 yrs | 64.2 |
| LUDLOW | Substation-Adjacent | MA | Hampden County | 345 kV | 600 MW | 3.9 yrs | 62.6 |
| Indian Orchard Solar Facility | Brownfield | MA | Hampden | — | 2 MW | 3.9 yrs | 60.4 |
| Greenfield (LUDLOW - BARBOUR HILL) | Greenfield | CO | Hampden County | 345 kV | 600 MW | 6.9 yrs | 59.9 |
| OZ Hampden | Greenfield | MA | Hampden | — | — | 3.5 yrs | 59.8 |
| EC Near Chicopee Electric | Greenfield | MA | Hampden | — | — | 3.5 yrs | 59.5 |
| OZ Hampden | Greenfield | MA | Hampden | — | — | 3.5 yrs | 59.4 |
Nearby internet exchanges
- Lightboard ★ MassachusettsSpringfield, MA · 7 networks
- Crown Castle Springfield (1 Federal)Springfield, MA · 4 networks
- Lightboard ★ New EnglandSpringfield, MA · 2 networks
- Lumen HartfordHartford, CT · 1 networks
See all datacenter sites in Massachusetts →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Northampton Landfill Solar, Northampton, Massachusetts. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.