Bettendorf, Scott, Iowa · MidAmerican Energy Co

Legacy capacity
141
MW

Riverside is a natural gas plant in Bettendorf, Scott, Iowa, retired 2021-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 141 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity141 MW
Retirement date2021-01-01
EIA plant ID#1081

Grid hookup & remediation

Nearest substation0.1 mi
Operator address6001 State Street, Bettendorf, IA, 52722
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Scott County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)81,225
IT / tech employment23
Construction employment6,015
Land value$10,076/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate11.03¢/kWh
Industrial power rate7.12¢/kWh
Load growth (FERC-714)1.2%

Water & cooling

Water stressLow
Public water supply17.8 MGD
Industrial water use1.1 MGD
Cooling degree days900
Mean annual temp48°F

Hazard, flood & connectivity

FEMA risk index30.0 · Relatively Moderate
Fiber providers14 · 88% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Riverside — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Milton L Kappnatural gas plant23721.6 mi—
Fair Stationcoal plant6320.2 mi—
Archer Daniels Midland Clintoncoal plant3123.0 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Riverside

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Riverside, ranked by DC Readiness.

Candidate sites near Riverside
SiteTypeStateCountyVoltageCapacityQueue waitScore
SUB 39Substation-AdjacentILRock Island County345 kV600 MW3.8 yrs67.6
UNKNOWN131382Substation-AdjacentIAScott County345 kV600 MW2.8 yrs67.6
UNKNOWN131604Substation-AdjacentIAScott County345 kV600 MW2.8 yrs67.1
QUAD CITIESSubstation-AdjacentILClinton County345 kV600 MW3.8 yrs67.0
SUB 91Substation-AdjacentIAScott County345 kV600 MW2.8 yrs67.0
OAK GROVESubstation-AdjacentILRock Island County345 kV600 MW3.8 yrs67.0
UNKNOWN122188Substation-AdjacentILClinton County345 kV600 MW3.8 yrs66.9
UNKNOWN131605Substation-AdjacentIARock Island County345 kV600 MW2.8 yrs66.7

Nearby internet exchanges

See all datacenter sites in Iowa →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.