Milton L Kapp

Brownfield

Clinton, Clinton, Iowa · Interstate Power and Light Co

Legacy capacity
237
MW

Milton L Kapp is a natural gas plant in Clinton, Clinton, Iowa, retired 2018-06-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 237 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity237 MW
Retirement date2018-06-01
EIA plant ID#1048

Grid hookup & remediation

Nearest substation0.4 mi
OperatorInterstate Power and Light Co
Operator address2001 Beaver Channel Parkway, Clinton, IA, 52732
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Milton L Kapp, ranked by DC Readiness.

Candidate sites near Milton L Kapp
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN122189Substation-AdjacentIAClinton County345 kV600 MW1.4 yrs76.6
SUB 39Substation-AdjacentILRock Island County345 kV600 MW1.4 yrs76.5
SUB 91Substation-AdjacentIAScott County345 kV600 MW1.4 yrs76.4
RiversideBrownfieldILRock Island141 MW74.5
UNKNOWN132671Substation-AdjacentILRock Island County161 kV100 MW1.4 yrs73.7
UNKNOWN132672Substation-AdjacentILRock Island County161 kV100 MW1.4 yrs73.7
TAP137690Substation-AdjacentIAScott County161 kV100 MW1.4 yrs73.4
RIVERSIDESubstation-AdjacentILRock Island County161 kV100 MW1.4 yrs73.1

Nearby internet exchanges

See all datacenter sites in Iowa

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Milton L Kapp, Clinton, Clinton, Iowa. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.