Silver Gate

Brownfield

San Diego, California · San Diego Gas & Electric Co

Legacy capacity
247
MW

Silver Gate is a oil plant in San Diego, California, retired 1985-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 247 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity247 MW
Retirement date1985-01-01
EIA plant ID#309

Grid hookup & remediation

Nearest substation1.4 mi
OperatorSan Diego Gas & Electric Co
Operator addressCA, 92113
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Silver Gate, ranked by DC Readiness.

Candidate sites near Silver Gate
SiteTypeStateCountyVoltageCapacityQueue waitScore
MIGUELSubstation-AdjacentCASan Diego County500 kV1,000 MW5.7 yrs66.3
OLD TOWNSubstation-AdjacentCASan Diego County230 kV300 MW5.7 yrs64.0
PENASQUITOSSubstation-AdjacentCASan Diego County230 kV300 MW5.7 yrs63.4
LOS COCHESSubstation-AdjacentCASan Diego County230 kV300 MW5.7 yrs62.0
OTAY MESASubstation-AdjacentCASan Diego County230 kV300 MW5.7 yrs60.7
SYCAMORE CANYONSubstation-AdjacentCASan Diego County230 kV300 MW5.7 yrs60.5
CHICARITASubstation-AdjacentCASan Diego County138 kV100 MW5.7 yrs59.7
GRANT HILLSubstation-AdjacentCASan Diego County138 kV100 MW5.7 yrs58.1

Nearby internet exchanges

See all datacenter sites in California

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.