Portola
BrownfieldPortola, Plumas, California · Sierra Pacific Power Co
Portola is a oil plant in Portola, Plumas, California, retired 2007-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 6 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Plumas County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Get alerts
Track Portola
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Portola, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| Portola | Brownfield | CA | Sierra County | 60 kV | 6 MW | 5.7 yrs | 47.1 |
| EC Near Portola | Greenfield | CA | Plumas | — | — | 5.7 yrs | 46.9 |
| STAMPEDE DAM | Substation-Adjacent | CA | Sierra County | 69 kV | 50 MW | 8.2 yrs | 46.8 |
| SIERRA BROOKS | Substation-Adjacent | CA | Sierra County | 69 kV | 50 MW | 8.2 yrs | 46.3 |
| CEMETERY | Substation-Adjacent | CA | Sierra County | 69 kV | 50 MW | 8.2 yrs | 46.3 |
| CHILCOOT | Substation-Adjacent | CA | Sierra County | 69 kV | 50 MW | 8.2 yrs | 46.2 |
| SIERRAVILLE | Substation-Adjacent | CA | Sierra County | 69 kV | 50 MW | 8.2 yrs | 45.7 |
| UNKNOWN306122 | Substation-Adjacent | CA | Plumas County | 69 kV | 50 MW | 8.2 yrs | 45.4 |
See all datacenter sites in California →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Portola, Portola, Plumas, California. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.