Mt Poso Cogeneration

Brownfield

Bakersfield, Kern, California · Mt Poso Cogeneration Co

Legacy capacity
62
MW

Mt Poso Cogeneration is a former biomass site in Bakersfield, Kern, California, retired 2024-11-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 62 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer biomass site
Site typeretired_plant
Existing capacity62 MW
Retirement date2024-11-01
EIA plant ID#54626

Grid hookup & remediation

Nearest substation0.0 mi
Operator address36157 Famoso Woody Road, Bakersfield, CA, 93308
Why this site is datacenter-attractive: a former biomass site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Kern County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)274,649
Construction employment16,203
Land value$10,539/acre

Power economics & interconnection

Commercial power rate23.14¢/kWh
Industrial power rate18.13¢/kWh
Load growth (FERC-714)1.3%

Water & cooling

Water stressHigh
Public water supply168.9 MGD
Industrial water use2.5 MGD
Cooling degree days1,000
Mean annual temp59°F

Hazard, flood & connectivity

FEMA risk index48.0 · Relatively High
Fiber providers12 · 39% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Mt Poso Cogeneration — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Regulus Solar Power Plantformer brownfield site8215.5 micleanup_complete
Western Power & Steam Incnatural gas plant89.4 mi—
Kern River Fee C Cogennatural gas plant87.8 mi—
Kern River Fee A Cogennatural gas plant78.1 mi—
Kern River Fee B Cogennatural gas plant49.4 mi—
Roll Delano 2natural gas plant217.2 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Mt Poso Cogeneration

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Mt Poso Cogeneration, ranked by DC Readiness.

Candidate sites near Mt Poso Cogeneration
SiteTypeStateCountyVoltageCapacityQueue waitScore
Kern River Fee B CogenBrownfieldCAKern County115 kV4 MW5.7 yrs49.9
Kern River Fee C CogenBrownfieldCAKern County115 kV8 MW5.7 yrs49.2
BAKERSFIELDSubstation-AdjacentCAKern County230 kV300 MW8.2 yrs49.0
KERNSubstation-AdjacentCAKern County230 kV300 MW8.2 yrs49.0
STOCKDALESubstation-AdjacentCAKern County230 kV300 MW8.2 yrs49.0
UNKNOWN306031Substation-AdjacentCAKern County230 kV300 MW8.2 yrs49.0
VESTALSubstation-AdjacentCATulare County230 kV300 MW8.2 yrs49.0
RENFROSubstation-AdjacentCAKern County230 kV300 MW8.2 yrs48.9

See all datacenter sites in California →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Mt Poso Cogeneration, Bakersfield, Kern, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.