Kern River Fee C Cogen

Brownfield

Bakersfield, Kern, California · Chevron USA Inc

Legacy capacity
8
MW

Kern River Fee C Cogen is a natural gas plant in Bakersfield, Kern, California, retired 2011-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 8 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity8 MW
Retirement date2011-03-01
EIA plant ID#52095

Grid hookup & remediation

Nearest substation0.7 mi
OperatorChevron USA Inc
Operator address1546 China Grade Loop, Bakersfield, CA, 93308
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Kern River Fee C Cogen, ranked by DC Readiness.

Candidate sites near Kern River Fee C Cogen
SiteTypeStateCountyVoltageCapacityQueue waitScore
MAGUNDENSubstation-AdjacentCAKern County230 kV300 MW5.8 yrs61.0
SYCAMORE COGENSubstation-AdjacentCAKern County230 kV300 MW5.8 yrs60.8
OMARSubstation-AdjacentCAKern County230 kV300 MW5.8 yrs60.0
KERNSubstation-AdjacentCAKern County230 kV300 MW5.8 yrs60.0
WHEELER RIDGESubstation-AdjacentCAKern County230 kV300 MW5.8 yrs59.8
Greenfield (MIDWAY - WHIRLWIND)GreenfieldCAKern County500 kV1,000 MW5.8 yrs59.6
Greenfield (MIDWAY - WHIRLWIND)GreenfieldCAKern County500 kV1,000 MW5.8 yrs58.7
Greenfield (VINCENT - MIDWAY)GreenfieldCAKern County500 kV1,000 MW5.8 yrs58.6

See all datacenter sites in California

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Kern River Fee C Cogen, Bakersfield, Kern, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.