Gates Peaker

Brownfield

Huron, Fresno, California · Wellhead Services, Inc

Legacy capacity
47
MW

Gates Peaker is a natural gas plant in Huron, Fresno, California, retired 2013-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 47 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity47 MW
Retirement date2013-01-01
EIA plant ID#55875

Grid hookup & remediation

Nearest substation1.3 mi
OperatorWellhead Services, Inc
Operator address39950 S. Butte Avenue, Huron, CA, 93234
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Gates Peaker, ranked by DC Readiness.

Candidate sites near Gates Peaker
SiteTypeStateCountyVoltageCapacityQueue waitScore
GATESSubstation-AdjacentCAKings County500 kV1,000 MW5.7 yrs61.8
CARUTHERSSubstation-AdjacentCAFresno County230 kV300 MW5.8 yrs60.2
Greenfield (MIDWAY - LOS BANOS)GreenfieldCAKings County500 kV1,000 MW5.8 yrs59.3
UNKNOWN307522Substation-AdjacentCAFresno County230 kV300 MW5.8 yrs59.1
ARCOSubstation-AdjacentCAKings County230 kV300 MW5.8 yrs58.7
Greenfield (MIDWAY - GATES)GreenfieldCAKings County500 kV1,000 MW5.8 yrs58.3
Greenfield (MIDWAY - LOS BANOS)GreenfieldCAKings County500 kV1,000 MW5.8 yrs57.3
Greenfield (MIDWAY - LOS BANOS)GreenfieldCASan Benito County500 kV1,000 MW5.8 yrs56.8

See all datacenter sites in California

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Gates Peaker, Huron, Fresno, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.