Gates Peaker
BrownfieldHuron, Fresno, California · Wellhead Services, Inc
Gates Peaker is a natural gas plant in Huron, Fresno, California, retired 2013-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 47 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Fresno County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Gates Peaker — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Helms Energy Center | natural gas plant | 48 | 27.5 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Gates Peaker
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Gates Peaker, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| GATES | Substation-Adjacent | CA | Kings County | 500 kV | 1,000 MW | 8.2 yrs | 55.8 |
| UNKNOWN307522 | Substation-Adjacent | CA | Fresno County | 230 kV | 300 MW | 8.2 yrs | 52.5 |
| Gates Peaker | Brownfield | CA | Kings County | 66 kV | 47 MW | 5.7 yrs | 51.6 |
| HENRIETTA | Substation-Adjacent | CA | Kings County | 230 kV | 300 MW | 8.2 yrs | 51.4 |
| ARCO | Substation-Adjacent | CA | Kings County | 230 kV | 300 MW | 8.2 yrs | 51.3 |
| Helms Energy Center | Brownfield | CA | Fresno County | 66 kV | 48 MW | 5.7 yrs | 50.3 |
| EC Near Helms Energy Center | Greenfield | CA | Fresno | — | — | 5.7 yrs | 49.7 |
| EC Near Gates Peaker | Greenfield | CA | Fresno | — | — | 5.7 yrs | 48.1 |
See all datacenter sites in California →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Gates Peaker, Huron, Fresno, California. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.