Skip to content
Gridcensus

Farad

Brownfield

Floriston, Nevada, California · Sierra Pacific Power Co

Legacy capacity
3
MW

Farad is a former hydro site in Floriston, Nevada, California, retired 2006-05-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity3 MW
Retirement date2006-05-01
EIA plant ID#6512

Grid hookup & remediation

Nearest substation4.5 mi
Operator addressHwy 80, Floriston, CA, 96111
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Nevada County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)27,267
Construction employment3,474
Land value$8,650/acre

Power economics & interconnection

Commercial power rate29.25¢/kWh
Industrial power rate22.93¢/kWh
Load growth (FERC-714)1.3%

Water & cooling

Water stressHigh
Public water supply11.4 MGD
Industrial water use0.1 MGD
Cooling degree days1,000
Mean annual temp59°F

Hazard, flood & connectivity

FEMA risk index48.0 · Relatively High
Fiber providers6 · 14% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Farad — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Galena 3 Geothermal Power Plantformer geothermal site3014.6 mi—
Steamboat Hills LPformer geothermal site2213.7 mi—
Kings Beachoil plant1610.3 mi—
Steamboat 1former geothermal site814.3 mi—
Valley Roadoil plant616.1 mi—
Steamboat 1A Power Plantformer geothermal site214.3 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Farad

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Farad, ranked by DC Readiness.

Candidate sites near Farad
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORTH VALLEY ROADSubstation-AdjacentNVStorey County345 kV600 MW6.9 yrs63.4
MIRA LOMASubstation-AdjacentNVStorey County360 kV600 MW6.9 yrs63.4
EC Near Valley RoadGreenfieldNVWashoe——5.8 yrs62.2
EC Near Valley RoadGreenfieldNVWashoe——5.8 yrs62.2
SUGAR LOAFSubstation-AdjacentNVStorey County360 kV600 MW6.9 yrs61.3
EC Near Valley RoadGreenfieldNVWashoe——5.8 yrs61.0
EC Near Valley RoadGreenfieldNVWashoe——5.8 yrs60.9
EC Near Valley RoadGreenfieldNVWashoe——5.8 yrs60.5

Nearby internet exchanges

See all datacenter sites in California →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Farad, Floriston, Nevada, California. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.