El Centro Hybrid

Brownfield

El Centro, Imperial, California · Imperial Irrigation District

Legacy capacity
50
MW

El Centro Hybrid is a natural gas plant in El Centro, Imperial, California, retired 2010-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 50 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity50 MW
Retirement date2010-09-01
EIA plant ID#389

Grid hookup & remediation

Nearest substation0.1 mi
OperatorImperial Irrigation District
Operator address485 E. Villa Avenue, El Centro, CA, 92243
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near El Centro Hybrid, ranked by DC Readiness.

Candidate sites near El Centro Hybrid
SiteTypeStateCountyVoltageCapacityQueue waitScore
IMPERIAL VALLEYSubstation-AdjacentCAImperial County500 kV1,000 MW5.7 yrs58.4
MIDWAYSubstation-AdjacentCAImperial County230 kV300 MW5.7 yrs56.3
EL CENTROSubstation-AdjacentCAImperial County230 kV300 MW5.7 yrs56.1
Greenfield (NORTH GILA - IMPERIAL VALLEY)GreenfieldCAImperial County500 kV1,000 MW5.7 yrs55.3
Greenfield (NORTH GILA - IMPERIAL VALLEY)GreenfieldCAImperial County500 kV1,000 MW5.7 yrs55.2
Greenfield (SUNCREST - IMPERIAL VALLEY)GreenfieldCAImperial County500 kV1,000 MW5.7 yrs54.8
Greenfield (NORTH GILA - IMPERIAL VALLEY)GreenfieldCAImperial County500 kV1,000 MW5.7 yrs54.2
UNKNOWN308676Substation-AdjacentCAImperial County230 kV300 MW5.7 yrs53.9

See all datacenter sites in California

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for El Centro Hybrid, El Centro, Imperial, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.