Dynegy Moss Landing Power Plant Hybrid
BrownfieldMoss Landing, Monterey, California · Dynegy -Moss Landing LLC
Dynegy Moss Landing Power Plant Hybrid is a natural gas plant in Moss Landing, Monterey, California, retired 2016-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1,404 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Dynegy Moss Landing Power Plant Hybrid, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| MOSS LANDING | Substation-Adjacent | CA | Santa Cruz County | 500 kV | 1,000 MW | 5.7 yrs | 67.9 |
| COYOTE | Substation-Adjacent | CA | Santa Clara County | 230 kV | 300 MW | 5.7 yrs | 61.0 |
| Greenfield (MOSS LANDING - METCALF 1) | Greenfield | CA | Santa Clara County | 500 kV | 1,000 MW | 5.7 yrs | 59.4 |
| Greenfield (MOSS LANDING - METCALF 1) | Greenfield | CA | Santa Clara County | 500 kV | 1,000 MW | 5.7 yrs | 57.1 |
| LLAGAS | Substation-Adjacent | CA | Santa Clara County | 115 kV | 100 MW | 5.7 yrs | 56.5 |
| PAUL SWEET | Substation-Adjacent | CA | Santa Cruz County | 115 kV | 100 MW | 5.7 yrs | 56.2 |
| MORGAN HILL | Substation-Adjacent | CA | Santa Clara County | 115 kV | 100 MW | 5.7 yrs | 56.2 |
| IBM BAILEY | Substation-Adjacent | CA | Santa Clara County | 115 kV | 100 MW | 5.7 yrs | 56.1 |
Nearby internet exchanges
- Equinix SV1/SV5/SV10 - Silicon Valley, San JoseSan Jose, CA · 280 networks
- CoreSite - San Jose (SV1)San Jose, CA · 56 networks
- Equinix SV2 - Silicon Valley, Santa ClaraSanta Clara, CA · 24 networks
- Equinix SV3 - Silicon Valley, San JoseSan Jose, CA · 23 networks
See all datacenter sites in California →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Dynegy Moss Landing Power Plant Hybrid, Moss Landing, Monterey, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.