Dinuba Energy
BrownfieldReedley, Tulare, California · Dinuba Energy
Dinuba Energy is a former biomass site in Reedley, Tulare, California, retired 2024-07-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 12 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Tulare County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Dinuba Energy — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Aquamarine Solar Project | former brownfield site | 250 | 25.4 mi | cleanup_complete |
| Algonquin Power Sanger LLC | natural gas plant | 13 | 10.7 mi | — |
| Westlands Solar Park Phase I | former brownfield site | 2 | 25.4 mi | cleanup_complete |
| City of Tulare Water Facility | former biomass site | 1 | 26.8 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Dinuba Energy
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Dinuba Energy, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| OZ Fresno | Greenfield | CA | Fresno | — | — | 5.7 yrs | 56.0 |
| MANCHESTER | Substation-Adjacent | CA | Fresno County | 115 kV | 100 MW | 8.2 yrs | 54.5 |
| OZ Fresno | Greenfield | CA | Fresno | — | — | 5.7 yrs | 54.1 |
| MCCALL | Substation-Adjacent | CA | Fresno County | 230 kV | 300 MW | 8.2 yrs | 53.9 |
| OZ Fresno | Greenfield | CA | Fresno | — | — | 5.7 yrs | 53.9 |
| OZ Fresno | Greenfield | CA | Fresno | — | — | 5.7 yrs | 53.4 |
| Dinuba Energy | Brownfield | CA | Fresno County | 66 kV | 12 MW | 5.7 yrs | 53.1 |
| RECTOR | Substation-Adjacent | CA | Tulare County | 287 kV | 300 MW | 8.2 yrs | 52.8 |
Nearby internet exchanges
- Unwired FAT1 - Fresno ColocationFresno, CA · 1 networks
See all datacenter sites in California →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Dinuba Energy, Reedley, Tulare, California. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.