Aquamarine Solar Project
BrownfieldFresno, California
Aquamarine Solar Project is a former brownfield site in Fresno, California. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 250 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Aquamarine Solar Project — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Helms Energy Center | natural gas plant | 48 | 23.9 mi | — |
| Fresno Cogen Partners | natural gas plant | 32 | 20.5 mi | — |
| Algonquin Power Sanger LLC | natural gas plant | 13 | 15.0 mi | — |
| Dinuba Energy | former biomass site | 12 | 25.4 mi | — |
| Kerckhoff | former hydro site | 11 | 25.2 mi | — |
| Westlands Solar Park Phase I | former brownfield site | 2 | 0.0 mi | cleanup_complete |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Aquamarine Solar Project
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Aquamarine Solar Project, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| ASHLAN AVE | Substation-Adjacent | CA | Fresno County | 230 kV | 300 MW | 8.2 yrs | 56.1 |
| OZ Fresno | Greenfield | CA | Fresno | — | — | 5.7 yrs | 56.0 |
| GREGG | Substation-Adjacent | CA | Fresno County | 230 kV | 300 MW | 8.2 yrs | 55.9 |
| UNKNOWN301827 | Substation-Adjacent | CA | Fresno County | 230 kV | 300 MW | 8.2 yrs | 55.4 |
| BORDEN | Substation-Adjacent | CA | Fresno County | 230 kV | 300 MW | 8.2 yrs | 55.4 |
| TAP307972 | Substation-Adjacent | CA | Fresno County | 230 kV | 300 MW | 8.2 yrs | 55.3 |
| MANCHESTER | Substation-Adjacent | CA | Fresno County | 115 kV | 100 MW | 8.2 yrs | 54.5 |
| OZ Fresno | Greenfield | CA | Fresno | — | — | 5.7 yrs | 54.1 |
Nearby internet exchanges
- Unwired FAT1 - Fresno ColocationFresno, CA · 1 networks
See all datacenter sites in California →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Aquamarine Solar Project, Fresno, California. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.