Cloverdale Solar
BrownfieldCloverdale, California
Cloverdale Solar is a former landfill site in Cloverdale, California. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Cloverdale Solar — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Geysers Unit 5-20 | former geothermal site | 110 | 14.6 mi | — |
| Buckeye Geothermal Power Plant | former geothermal site | 57 | 9.6 mi | — |
| Wild Horse Power Plant | former geothermal site | 48 | 10.5 mi | — |
| West Ford Flat Power Plant | former geothermal site | 38 | 15.8 mi | — |
| Bear Canyon Power Plant | former geothermal site | 24 | 17.5 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Cloverdale Solar
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Cloverdale Solar, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| FULTON | Substation-Adjacent | CA | Sonoma County | 230 kV | 300 MW | 8.2 yrs | 53.7 |
| SOCRATES 19 | Substation-Adjacent | CA | Sonoma County | 230 kV | 300 MW | 8.2 yrs | 52.9 |
| WEST FORD FLAT | Substation-Adjacent | CA | Sonoma County | 230 kV | 300 MW | 8.2 yrs | 52.5 |
| BEAR CANYON | Substation-Adjacent | CA | Sonoma County | 230 kV | 300 MW | 8.2 yrs | 52.3 |
| QUICKSILVER | Substation-Adjacent | CA | Sonoma County | 230 kV | 300 MW | 8.2 yrs | 51.3 |
| BIG GEYSERS | Substation-Adjacent | CA | Sonoma County | 230 kV | 300 MW | 8.2 yrs | 51.3 |
| GEYSERS TAP 9 | Substation-Adjacent | CA | Sonoma County | 230 kV | 300 MW | 8.2 yrs | 51.3 |
| CALISTOGA 199 | Substation-Adjacent | CA | Sonoma County | 230 kV | 300 MW | 8.2 yrs | 51.3 |
Nearby internet exchanges
- X2nSat PetalumaPetaluma, CA · 0 networks
See all datacenter sites in California →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Cloverdale Solar, Cloverdale, California. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.