TAP163519

Substation

Wisconsin · NORTHERN STATES POWER CO - WISCONSIN

Max voltage
—
kV

At a glance

TAP163519 is an electric substation in Wisconsin on NORTHERN STATES POWER CO - WISCONSIN's transmission network, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN129869 in Eau Claire County, with a DC Readiness score of 65/100.

TAP163519 is an electric transmission substation in Wisconsin, on NORTHERN STATES POWER CO - WISCONSIN's transmission network. It is classified as unclassified and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines1

Ownership

Coordinates44.9190, -91.3372

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#160449—NORTHERN STATES POWER CO - WISCONSININ SERVICE2.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP163519, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP163519 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN129869Substation-AdjacentWIEau Claire County345 kV600 MW4.3 yrs64.9
OZ ChippewaGreenfieldWIChippewa——4.3 yrs61.5
EC Near Elk MoundGreenfieldWIChippewa——4.3 yrs61.4
EC Near WheatonGreenfieldWIChippewa——4.3 yrs60.8
UNKNOWN131979Substation-AdjacentWIDunn County161 kV100 MW4.3 yrs60.4
UNKNOWN131980Substation-AdjacentWIEau Claire County161 kV100 MW4.3 yrs60.3
UNKNOWN163509Substation-AdjacentWIPepin County161 kV100 MW4.3 yrs60.2
EC Near WheatonGreenfieldWIChippewa——4.3 yrs60.2

Who owns the transmission lines at TAP163519?

The 1 connected line listed above is owned by NORTHERN STATES POWER CO - WISCONSIN. Their combined recorded length is about 2.6 miles.

How do candidate sites near TAP163519 score?

The 8 highest-scoring candidate sites within about 25 miles range from 60 to 65 on the 0–100 DC Readiness scale. They fall in Eau Claire County, Chippewa, Dunn County, Pepin County. The Wisconsin average across 3,340 scored sites is 55.4. 1,248 of those Wisconsin sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP163519 substation?

1 transmission line terminate at or pass through TAP163519 in the HIFLD line data. Together the listed lines cover about 2.6 miles.

Who owns TAP163519 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP163519 belong to NORTHERN STATES POWER CO - WISCONSIN. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP163519 substation located?

TAP163519 is in Wisconsin at 44.9190, -91.3372. The datacenter candidate sites closest to it are in Eau Claire County, Chippewa, Dunn County.

Are there datacenter candidate sites near TAP163519 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP163519. The highest-scoring is UNKNOWN129869 at 65/100. Across Wisconsin, the average DC Readiness score is 55.4.

More in Wisconsin

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP163519 substation, Wisconsin”, https://gridcensus.com/substations/wisconsin/tap163519-61c908c9 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP163519 substation, Wisconsin is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.