TAP163270

Substation

Wisconsin · AMERICAN TRANSMISSION CO

Max voltage
69
kV

At a glance

TAP163270 is a 69 kV electric substation in Wisconsin on AMERICAN TRANSMISSION CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is GENOA in Houston County, with a DC Readiness score of 61/100.

TAP163270 is an electric transmission substation in Wisconsin, on AMERICAN TRANSMISSION CO's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Line owner (most lines)AMERICAN TRANSMISSION CO
Coordinates43.4845, -90.9873

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16008469 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE12.5 mi
#16336669 kVAMERICAN TRANSMISSION COIN SERVICE4.3 mi
#16683369 kVAMERICAN TRANSMISSION COIN SERVICE8.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP163270, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP163270 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GENOASubstation-AdjacentWIHouston County161 kV100 MW4.3 yrs60.5
UNKNOWN130580Substation-AdjacentIAAllamakee County161 kV100 MW4.3 yrs60.4
EC Coal Vernon CountyGreenfieldWIVernon County——4.3 yrs59.7
EC Coal La Crosse CountyGreenfieldWILa Crosse County——4.3 yrs59.5
EC Coal Vernon CountyGreenfieldWIVernon County——4.3 yrs59.5
EC Coal Vernon CountyGreenfieldWIVernon County——4.3 yrs59.2
EC Near GenoaGreenfieldWIVernon——4.3 yrs59.2
EC Coal Houston CountyGreenfieldMNHouston County——4.3 yrs58.5

Who owns the transmission lines at TAP163270?

The 3 connected lines listed above are owned by NORTHERN STATES POWER CO - WISCONSIN, AMERICAN TRANSMISSION CO. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 25.7 miles.

How do candidate sites near TAP163270 score?

The 8 highest-scoring candidate sites within about 25 miles range from 59 to 61 on the 0–100 DC Readiness scale. They fall in Houston County, Allamakee County, Vernon County, La Crosse County. The Wisconsin average across 3,340 scored sites is 55.4. 1,248 of those Wisconsin sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP163270 substation?

TAP163270 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP163270 is below the national midpoint.

How many transmission lines connect to TAP163270 substation?

3 transmission lines terminate at or pass through TAP163270 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 25.7 miles.

Who owns TAP163270 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP163270 belong to AMERICAN TRANSMISSION CO, and others to NORTHERN STATES POWER CO - WISCONSIN. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP163270 substation located?

TAP163270 is in Wisconsin at 43.4845, -90.9873. The datacenter candidate sites closest to it are in Houston County, Allamakee County, Vernon County.

Are there datacenter candidate sites near TAP163270 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP163270. The highest-scoring is GENOA at 61/100. Across Wisconsin, the average DC Readiness score is 55.4.

More in Wisconsin

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP163270 substation, Wisconsin”, https://gridcensus.com/substations/wisconsin/tap163270-4b3bfee7 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP163270 substation, Wisconsin is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.