TAP163250

Substation

Wisconsin · NORTHERN STATES POWER CO - WISCONSIN

Max voltage
69
kV

At a glance

TAP163250 is a 69 kV electric substation in Wisconsin on NORTHERN STATES POWER CO - WISCONSIN's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN129869 in Eau Claire County, with a DC Readiness score of 65/100.

TAP163250 is an electric transmission substation in Wisconsin, on NORTHERN STATES POWER CO - WISCONSIN's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Coordinates44.9259, -91.7883

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16015769 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE12.5 mi
#16019669 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE11.1 mi
#16048269 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE12.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP163250, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP163250 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN129869Substation-AdjacentWIEau Claire County345 kV600 MW4.3 yrs64.9
UNKNOWN163358Substation-AdjacentWIDunn County161 kV100 MW4.3 yrs61.5
EC Near Elk MoundGreenfieldWIChippewa——4.3 yrs61.4
EC Near WheatonGreenfieldWIChippewa——4.3 yrs60.8
UNKNOWN131979Substation-AdjacentWIDunn County161 kV100 MW4.3 yrs60.4
UNKNOWN131980Substation-AdjacentWIEau Claire County161 kV100 MW4.3 yrs60.3
UNKNOWN163509Substation-AdjacentWIPepin County161 kV100 MW4.3 yrs60.2
EC Near WheatonGreenfieldWIChippewa——4.3 yrs60.2

Who owns the transmission lines at TAP163250?

The 3 connected lines listed above are owned by NORTHERN STATES POWER CO - WISCONSIN. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 36.1 miles.

How do candidate sites near TAP163250 score?

The 8 highest-scoring candidate sites within about 25 miles range from 60 to 65 on the 0–100 DC Readiness scale. They fall in Eau Claire County, Dunn County, Chippewa, Pepin County. The Wisconsin average across 3,340 scored sites is 55.4. 1,248 of those Wisconsin sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP163250 substation?

TAP163250 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP163250 is below the national midpoint.

How many transmission lines connect to TAP163250 substation?

3 transmission lines terminate at or pass through TAP163250 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 36.1 miles.

Who owns TAP163250 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP163250 belong to NORTHERN STATES POWER CO - WISCONSIN. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP163250 substation located?

TAP163250 is in Wisconsin at 44.9259, -91.7883. The datacenter candidate sites closest to it are in Eau Claire County, Dunn County, Chippewa.

Are there datacenter candidate sites near TAP163250 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP163250. The highest-scoring is UNKNOWN129869 at 65/100. Across Wisconsin, the average DC Readiness score is 55.4.

More in Wisconsin

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP163250 substation, Wisconsin”, https://gridcensus.com/substations/wisconsin/tap163250-c6d54a71 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP163250 substation, Wisconsin is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.