Skip to content
Gridcensus

INO PUMP

Substation

Wisconsin · NORTHERN STATES POWER CO - WISCONSIN

Max voltage
—
kV

At a glance

INO PUMP is an electric substation in Wisconsin on NORTHERN STATES POWER CO - WISCONSIN's transmission network, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. The highest-scoring datacenter candidate site within about 25 miles is GINGLES in Ashland County, with a DC Readiness score of 58/100.

INO PUMP is an electric transmission substation in Wisconsin, on NORTHERN STATES POWER CO - WISCONSIN's transmission network. It is classified as unclassified and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines1

Ownership

Coordinates46.6081, -91.2692

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#125824—NORTHERN STATES POWER CO - WISCONSININ SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of INO PUMP, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near INO PUMP substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GINGLESSubstation-AdjacentWIAshland County161 kV100 MW4.3 yrs58.3
OZ AshlandGreenfieldWIAshland——4.3 yrs57.7
UNKNOWN138654Substation-AdjacentWIBayfield County115 kV100 MW4.3 yrs57.5
TAP138650Substation-AdjacentWIAshland County115 kV100 MW4.3 yrs57.4
TAP173402Substation-AdjacentWIAshland County115 kV100 MW4.3 yrs57.4
TAP173400Substation-AdjacentWIBayfield County115 kV100 MW4.3 yrs57.2
Bay FrontBrownfieldWIAshland County—20 MW4.3 yrs55.6
UNKNOWN138668Substation-AdjacentWISawyer County115 kV100 MW4.3 yrs55.5

Who owns the transmission lines at INO PUMP?

The 1 connected line listed above is owned by NORTHERN STATES POWER CO - WISCONSIN. Their combined recorded length is about 0 miles.

How do candidate sites near INO PUMP score?

The 8 highest-scoring candidate sites within about 25 miles range from 56 to 58 on the 0–100 DC Readiness scale. They fall in Ashland County, Ashland, Bayfield County, Sawyer County. The Wisconsin average across 3,340 scored sites is 55.4. 1,248 of those Wisconsin sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to INO PUMP substation?

1 transmission line terminate at or pass through INO PUMP in the HIFLD line data. Together the listed lines cover about 0 miles.

Who owns INO PUMP substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at INO PUMP belong to NORTHERN STATES POWER CO - WISCONSIN. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is INO PUMP substation located?

INO PUMP is in Wisconsin at 46.6081, -91.2692. The datacenter candidate sites closest to it are in Ashland County, Ashland, Bayfield County.

Are there datacenter candidate sites near INO PUMP substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of INO PUMP. The highest-scoring is GINGLES at 58/100. Across Wisconsin, the average DC Readiness score is 55.4.

More in Wisconsin

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “INO PUMP substation, Wisconsin”, https://gridcensus.com/substations/wisconsin/ino-pump-86f9cd31 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for INO PUMP substation, Wisconsin is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.