TAP205371

Substation

Washington · MODERN ELECTRIC WATER COMPANY

Max voltage
115
kV

At a glance

TAP205371 is a 115 kV electric substation in Washington on MODERN ELECTRIC WATER COMPANY's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is BELL in Spokane County, with a DC Readiness score of 68/100.

TAP205371 is an electric transmission substation in Washington, on MODERN ELECTRIC WATER COMPANY's transmission network. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership

Line owner (most lines)MODERN ELECTRIC WATER COMPANY
Coordinates47.6558, -117.2815

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#204030115 kVINLAND POWER & LIGHT COMPANY—2.7 mi
#204094115 kVMODERN ELECTRIC WATER COMPANY—0.7 mi
#204095115 kVMODERN ELECTRIC WATER COMPANY—1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205371, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205371 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BELLSubstation-AdjacentWASpokane County500 kV1,000 MW3.5 yrs68.0
OZ SpokaneGreenfieldWASpokane——3.5 yrs65.4
LANCASTERSubstation-AdjacentIDKootenai County230 kV300 MW5.0 yrs64.9
UNKNOWN201468Substation-AdjacentWASpokane County230 kV300 MW3.5 yrs64.7
BEACONSubstation-AdjacentWASpokane County230 kV300 MW3.5 yrs63.9
WESTSIDESubstation-AdjacentWASpokane County230 kV300 MW3.5 yrs63.4
OZ KootenaiGreenfieldIDKootenai——5.0 yrs62.5
Greenfield (BELL - TAFT)GreenfieldAZSpokane County500 kV1,000 MW3.5 yrs61.4

Who owns the transmission lines at TAP205371?

The 3 connected lines listed above are owned by INLAND POWER & LIGHT COMPANY, MODERN ELECTRIC WATER COMPANY. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 4.5 miles.

How do candidate sites near TAP205371 score?

The 8 highest-scoring candidate sites within about 25 miles range from 61 to 68 on the 0–100 DC Readiness scale. They fall in Spokane County, Spokane, Kootenai County, Kootenai. The Washington average across 6,019 scored sites is 51.7. 1,343 of those Washington sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP205371 substation?

TAP205371 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP205371 is at the national midpoint.

How many transmission lines connect to TAP205371 substation?

3 transmission lines terminate at or pass through TAP205371 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 4.5 miles.

Who owns TAP205371 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP205371 belong to MODERN ELECTRIC WATER COMPANY, and others to INLAND POWER & LIGHT COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP205371 substation located?

TAP205371 is in Washington at 47.6558, -117.2815. The datacenter candidate sites closest to it are in Spokane County, Spokane, Kootenai County.

Are there datacenter candidate sites near TAP205371 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP205371. The highest-scoring is BELL at 68/100. Across Washington, the average DC Readiness score is 51.7.

More in Washington

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP205371 substation, Washington”, https://gridcensus.com/substations/washington/tap205371-523f1648 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP205371 substation, Washington is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.