Skip to content
Gridcensus

Greenfield (BELL - TAFT)

Greenfield

Spokane County, Arizona · WECC

DC Readiness
60.3
Good / 100

Greenfield (BELL - TAFT) is a greenfield datacenter candidate site in Spokane County, Arizona, interconnecting through WECC. It screens at 60.3/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBELL
Substation voltage500 kV
Available capacity1,000 MW

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPNeutron - Spokane
IXP distance8.2 mi
Fiber providers16
Fiber coverage39.4%

Site characteristics

Site typeGreenfield
Land contactSpokane County County Assessor

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score72/100

Location context

Nearest datacenterLumen
DC distance8.5 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.06¢/kWh
Industrial electricity7.14¢/kWh
Cooling degree days300
Heating degree days5,000
Land price / acre$4,951

Incentive detail: Sales tax exemption on DC equipment and construction for eligible facilities; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power15%
42
Fiber connectivity12%
65
Energy cost10%
50
Water risk8%
64
Natural hazard8%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Spokane County, ranked by DC Readiness.

Sites near Greenfield (BELL - TAFT)
SiteTypeVoltageCapacityQueue waitScore
OZ SpokaneGreenfield1.7 yrs67.1
BELLSubstation-Adjacent500 kV1,000 MW6.9 yrs66.9
UNKNOWN201468Substation-Adjacent230 kV300 MW6.9 yrs64.1
BEACONSubstation-Adjacent230 kV300 MW6.9 yrs63.2
WESTSIDESubstation-Adjacent230 kV300 MW6.9 yrs62.6
UNKNOWN205382Substation-Adjacent115 kV100 MW6.9 yrs60.3
UNKNOWN200878Substation-Adjacent115 kV100 MW6.9 yrs60.2
COLLEGE AND WALNUTSubstation-Adjacent115 kV100 MW6.9 yrs60.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (BELL - TAFT), Spokane County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.