SCOOTENEY

Substation

Washington · BIG BEND ELECTRIC COOP, INC

Max voltage
115
kV

At a glance

SCOOTENEY is a 115 kV electric substation in Washington on BIG BEND ELECTRIC COOP, INC's transmission network, recorded in the HIFLD transmission dataset. 4 transmission lines connect to it. 137 of Washington's 785 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is COLUMBIA GENERATING STATION in Benton County, with a DC Readiness score of 66/100.

SCOOTENEY is an electric transmission substation in Washington, on BIG BEND ELECTRIC COOP, INC's transmission network. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage69 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership

Line owner (most lines)BIG BEND ELECTRIC COOP, INC
Coordinates46.6636, -119.0052

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#201055115 kVBONNEVILLE POWER ADMINISTRATION—7.2 mi
#207286115 kVBONNEVILLE POWER ADMINISTRATION—1.6 mi
#211352115 kVBIG BEND ELECTRIC COOP, INC—9.1 mi
#21135169 kVBIG BEND ELECTRIC COOP, INC—5.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SCOOTENEY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SCOOTENEY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COLUMBIA GENERATING STATIONSubstation-AdjacentWABenton County500 kV1,000 MW3.5 yrs66.2
WHITE BLUFFSSubstation-AdjacentWABenton County230 kV300 MW3.5 yrs63.0
WNP 1Substation-AdjacentWABenton County230 kV300 MW3.5 yrs61.9
BENTONSubstation-AdjacentWAFranklin County230 kV300 MW3.5 yrs61.0
UNKNOWN201507Substation-AdjacentWAGrant County115 kV100 MW3.5 yrs59.6
THAYER DRIVESubstation-AdjacentWABenton County115 kV100 MW3.5 yrs59.4
NORTH PASCOSubstation-AdjacentWABenton County115 kV100 MW3.5 yrs59.4
BROADMOORSubstation-AdjacentWABenton County115 kV100 MW3.5 yrs59.3

How does SCOOTENEY compare with other substations in Washington?

Washington has 2,106 substation records in HIFLD, of which 785 carry a station name; the rest are unnamed tap points, risers and line ends. 515 named substations in the state are in SCOOTENEY's 115–229 kV band (66% of named stations). 137 sit in a higher band. 34 named substations in Washington operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 115 kV.

Who owns the transmission lines at SCOOTENEY?

The 4 connected lines listed above are owned by BONNEVILLE POWER ADMINISTRATION, BIG BEND ELECTRIC COOP, INC. Line voltages range from 69 kV to 115 kV. Their combined recorded length is about 23.7 miles.

How do candidate sites near SCOOTENEY score?

The 8 highest-scoring candidate sites within about 25 miles range from 59 to 66 on the 0–100 DC Readiness scale. They fall in Benton County, Franklin County, Grant County. The Washington average across 6,019 scored sites is 51.7. 1,343 of those Washington sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is SCOOTENEY substation?

SCOOTENEY has a maximum voltage of 115 kV and a minimum of 69 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so SCOOTENEY is at the national midpoint.

How many transmission lines connect to SCOOTENEY substation?

4 transmission lines terminate at or pass through SCOOTENEY in the HIFLD line data. The connected lines listed here run at 115 kV, 69 kV. Together the listed lines cover about 23.7 miles.

Who owns SCOOTENEY substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at SCOOTENEY belong to BIG BEND ELECTRIC COOP, INC, and others to BONNEVILLE POWER ADMINISTRATION. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is SCOOTENEY substation located?

SCOOTENEY is in Washington at 46.6636, -119.0052. The datacenter candidate sites closest to it are in Benton County, Franklin County, Grant County.

Are there datacenter candidate sites near SCOOTENEY substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of SCOOTENEY. The highest-scoring is COLUMBIA GENERATING STATION at 66/100. Across Washington, the average DC Readiness score is 51.7.

Other 115 kV substations in Washington

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “SCOOTENEY substation, Washington”, https://gridcensus.com/substations/washington/scooteney-57b94d10 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for SCOOTENEY substation, Washington is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.