Skip to content
Gridcensus

BEVERLY PARK

Substation

Washington · PUGET SOUND ENERGY INC

Max voltage
115
kV

At a glance

BEVERLY PARK is a 115 kV electric substation in Washington on PUGET SOUND ENERGY INC's transmission network, recorded in the HIFLD transmission dataset. 7 transmission lines connect to it. 137 of Washington's 785 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is SNO-KING in Kitsap County, with a DC Readiness score of 68/100.

BEVERLY PARK is an electric transmission substation in Washington, on PUGET SOUND ENERGY INC's transmission network. It is classified as sub-transmission (115 kv) and connects 7 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage69 kV
Voltage classSub-transmission (115 kV)
Connected lines7

Ownership

Line owner (most lines)PUGET SOUND ENERGY INC
Coordinates47.9287, -122.2099

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#205751115 kVPUGET SOUND ENERGY INC—3.4 mi
#207278115 kVPUGET SOUND ENERGY INC—5.2 mi
#209395115 kVPUD 1 OF SNOHOMISH COUNTYIN SERVICE1.6 mi
#204338115 kVPUGET SOUND ENERGY INC—5.2 mi
#20759869 kVPUGET SOUND ENERGY INC—5.5 mi
#20759969 kVPUGET SOUND ENERGY INC—26.0 mi
#20939369 kVPUGET SOUND ENERGY INC—2.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BEVERLY PARK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BEVERLY PARK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SNO-KINGSubstation-AdjacentWAKitsap County500 kV1,000 MW3.5 yrs68.2
TAP200917Substation-AdjacentWASnohomish County500 kV1,000 MW3.5 yrs68.1
MONROESubstation-AdjacentWASnohomish County500 kV1,000 MW3.5 yrs67.8
SNOHOMISHSubstation-AdjacentWASnohomish County345 kV600 MW3.5 yrs66.5
BOTHELLSubstation-AdjacentWASnohomish County230 kV300 MW3.5 yrs64.8
TAP206030Substation-AdjacentWASnohomish County230 kV300 MW3.5 yrs64.5
HORSE RANCHSubstation-AdjacentWASnohomish County230 kV300 MW3.5 yrs64.4
SAMMAMISHSubstation-AdjacentWAKing County230 kV300 MW3.5 yrs64.2

How does BEVERLY PARK compare with other substations in Washington?

Washington has 2,106 substation records in HIFLD, of which 785 carry a station name; the rest are unnamed tap points, risers and line ends. 515 named substations in the state are in BEVERLY PARK's 115–229 kV band (66% of named stations). 137 sit in a higher band. 34 named substations in Washington operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 115 kV.

Who owns the transmission lines at BEVERLY PARK?

The 7 connected lines listed above are owned by PUGET SOUND ENERGY INC, PUD 1 OF SNOHOMISH COUNTY. Line voltages range from 69 kV to 115 kV. Their combined recorded length is about 49.1 miles.

How do candidate sites near BEVERLY PARK score?

The 8 highest-scoring candidate sites within about 25 miles range from 64 to 68 on the 0–100 DC Readiness scale. They fall in Kitsap County, Snohomish County, King County. The Washington average across 6,019 scored sites is 51.7. 1,343 of those Washington sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is BEVERLY PARK substation?

BEVERLY PARK has a maximum voltage of 115 kV and a minimum of 69 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so BEVERLY PARK is at the national midpoint.

How many transmission lines connect to BEVERLY PARK substation?

7 transmission lines terminate at or pass through BEVERLY PARK in the HIFLD line data. The connected lines listed here run at 115 kV, 69 kV. Together the listed lines cover about 49.1 miles.

Who owns BEVERLY PARK substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at BEVERLY PARK belong to PUGET SOUND ENERGY INC, and others to PUD 1 OF SNOHOMISH COUNTY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is BEVERLY PARK substation located?

BEVERLY PARK is in Washington at 47.9287, -122.2099. The datacenter candidate sites closest to it are in Kitsap County, Snohomish County, King County.

Are there datacenter candidate sites near BEVERLY PARK substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of BEVERLY PARK. The highest-scoring is SNO-KING at 68/100. Across Washington, the average DC Readiness score is 51.7.

Other 115 kV substations in Washington

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “BEVERLY PARK substation, Washington”, https://gridcensus.com/substations/washington/beverly-park-c1ef5316 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for BEVERLY PARK substation, Washington is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.