Skip to content
Gridcensus

WHITESTONE BRANCH

Substation

Virginia

Max voltage
69
kV

WHITESTONE BRANCH is an electric transmission substation in Virginia. It is classified as distribution (69–115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines1

Ownership & operation

Operator not catalogued for this substation.

Coordinates37.1728, -81.9553

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WHITESTONE BRANCH, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WHITESTONE BRANCH substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BROADFORD (765 KV)Substation-AdjacentVASmyth County765 kV1,000 MW5.1 yrs64.4
EC Coal Russell CountyGreenfieldVARussell County——5.1 yrs60.5
EC Coal Russell CountyGreenfieldVARussell County——5.1 yrs60.0
CLINCH RIVERSubstation-AdjacentVARussell County138 kV100 MW5.1 yrs59.8
EC Coal Russell CountyGreenfieldVARussell County——5.1 yrs59.7
OZ BuchananGreenfieldVABuchanan——5.1 yrs59.2
EC Near Clinch RiverGreenfieldVARussell——5.1 yrs58.8
TAP155304Substation-AdjacentWVMcDowell County138 kV100 MW3.0 yrs58.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for WHITESTONE BRANCH substation, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.