Skip to content
Gridcensus

BROADFORD (765 KV)

Substation-Adjacent

SMYTH, Virginia · PJM

DC Readiness
63.6
Good / 100

BROADFORD (765 KV) is a substation-adjacent datacenter candidate site in SMYTH, Virginia, interconnecting through PJM. It screens at 63.6/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBROADFORD (765 KV)
Substation distance0.0 mi
Substation voltage765 kV
Available capacity1,000 MW

Speed to power

Interconnection outlookConstrained
≈ 3.8 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth878
Avg queue wait3.8 yrs

Connectivity

Nearest IXP801 Main Street - Lenoir
IXP distance69.5 mi
Fiber providers2
Fiber coverage98.3%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenter801 Main Street - Lenoir
DC distance69.5 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.67¢/kWh
Industrial electricity5.33¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$3,971

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track BROADFORD (765 KV)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
100
Speed to power20%
41
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in SMYTH, ranked by DC Readiness.

Sites near BROADFORD (765 KV)
SiteTypeVoltageCapacityQueue waitScore
OZ SmythGreenfield3.1 yrs57.8
Greenfield (JACKSONS FERRY - BROADFORD (76)Greenfield765 kV1,000 MW3.8 yrs57.6
OZ SmythGreenfield3.1 yrs56.8
EC FFE Smyth CountyGreenfield3.1 yrs56.3
UNKNOWN113971Substation-Adjacent138 kV100 MW3.8 yrs55.8
UNKNOWN117056Substation-Adjacent138 kV100 MW3.8 yrs55.8
UNKNOWN117059Substation-Adjacent138 kV100 MW3.8 yrs55.7
TAP151951Substation-Adjacent138 kV100 MW3.8 yrs55.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen