Skip to content
Gridcensus

TAP160536

Substation

Virginia · APPALACHIAN POWER CO

Max voltage
69
kV

At a glance

TAP160536 is a 69 kV electric substation in Virginia on APPALACHIAN POWER CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is BROADFORD (765 KV) in Smyth County, with a DC Readiness score of 64/100.

TAP160536 is an electric transmission substation in Virginia, on APPALACHIAN POWER CO's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Line owner (most lines)APPALACHIAN POWER CO
Coordinates37.1648, -81.9581

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16430769 kVAPPALACHIAN POWER COIN SERVICE0.6 mi
#16430869 kVAPPALACHIAN POWER COIN SERVICE0.0 mi
#16430969 kVAPPALACHIAN POWER COIN SERVICE0.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP160536, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP160536 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BROADFORD (765 KV)Substation-AdjacentVASmyth County765 kV1,000 MW5.1 yrs64.4
EC Coal Russell CountyGreenfieldVARussell County——5.1 yrs60.5
EC Coal Russell CountyGreenfieldVARussell County——5.1 yrs60.0
CLINCH RIVERSubstation-AdjacentVARussell County138 kV100 MW5.1 yrs59.8
EC Coal Russell CountyGreenfieldVARussell County——5.1 yrs59.7
OZ BuchananGreenfieldVABuchanan——5.1 yrs59.2
EC Near Clinch RiverGreenfieldVARussell——5.1 yrs58.8
TAP155304Substation-AdjacentWVMcDowell County138 kV100 MW3.0 yrs58.5

Who owns the transmission lines at TAP160536?

The 3 connected lines listed above are owned by APPALACHIAN POWER CO. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 1.3 miles.

How do candidate sites near TAP160536 score?

The 8 highest-scoring candidate sites within about 25 miles range from 59 to 64 on the 0–100 DC Readiness scale. They fall in Smyth County, Russell County, Buchanan, Russell. The Virginia average across 5,871 scored sites is 52.6. 733 of those Virginia sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP160536 substation?

TAP160536 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP160536 is below the national midpoint.

How many transmission lines connect to TAP160536 substation?

3 transmission lines terminate at or pass through TAP160536 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 1.3 miles.

Who owns TAP160536 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP160536 belong to APPALACHIAN POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP160536 substation located?

TAP160536 is in Virginia at 37.1648, -81.9581. The datacenter candidate sites closest to it are in Smyth County, Russell County, Buchanan.

Are there datacenter candidate sites near TAP160536 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP160536. The highest-scoring is BROADFORD (765 KV) at 64/100. Across Virginia, the average DC Readiness score is 52.6.

More in Virginia

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP160536 substation, Virginia”, https://gridcensus.com/substations/virginia/tap160536-c168955e (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP160536 substation, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.