TAP151951

Substation

Virginia · APPALACHIAN POWER CO

Max voltage
138
kV

At a glance

TAP151951 is a 138 kV electric substation in Virginia on APPALACHIAN POWER CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is BROADFORD (765 KV) in Smyth County, with a DC Readiness score of 64/100.

TAP151951 is an electric transmission substation in Virginia, on APPALACHIAN POWER CO's transmission network. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership

Line owner (most lines)APPALACHIAN POWER CO
Coordinates36.8966, -81.7540

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#112436138 kVAPPALACHIAN POWER COIN SERVICE25.3 mi
#121611138 kVAPPALACHIAN POWER COIN SERVICE0.1 mi
#139288138 kVAPPALACHIAN POWER COIN SERVICE20.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP151951, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP151951 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BROADFORD (765 KV)Substation-AdjacentVASmyth County765 kV1,000 MW5.1 yrs64.4
UNKNOWN113973Substation-AdjacentVABristol city138 kV100 MW5.1 yrs60.7
EC Coal Russell CountyGreenfieldVARussell County——5.1 yrs60.5
EC Coal Russell CountyGreenfieldVARussell County——5.1 yrs59.7
Greenfield (JACKSONS FERRY - BROADFORD (76)GreenfieldVASmyth County765 kV1,000 MW5.1 yrs58.4
OZ TazewellGreenfieldVATazewell——5.1 yrs57.8
FARADAYSubstation-AdjacentWVTazewell County138 kV100 MW3.0 yrs57.8
EC Coal Russell CountyGreenfieldVARussell County——5.1 yrs57.7

Who owns the transmission lines at TAP151951?

The 3 connected lines listed above are owned by APPALACHIAN POWER CO. Line voltages range from 138 kV to 138 kV. Their combined recorded length is about 46.3 miles.

How do candidate sites near TAP151951 score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 64 on the 0–100 DC Readiness scale. They fall in Smyth County, Bristol city, Russell County, Tazewell. The Virginia average across 5,871 scored sites is 52.6. 733 of those Virginia sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP151951 substation?

TAP151951 has a maximum voltage of 138 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP151951 is above the national midpoint.

How many transmission lines connect to TAP151951 substation?

3 transmission lines terminate at or pass through TAP151951 in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 46.3 miles.

Who owns TAP151951 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP151951 belong to APPALACHIAN POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP151951 substation located?

TAP151951 is in Virginia at 36.8966, -81.7540. The datacenter candidate sites closest to it are in Smyth County, Bristol city, Russell County.

Are there datacenter candidate sites near TAP151951 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP151951. The highest-scoring is BROADFORD (765 KV) at 64/100. Across Virginia, the average DC Readiness score is 52.6.

More in Virginia

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP151951 substation, Virginia”, https://gridcensus.com/substations/virginia/tap151951-1bdb0302 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP151951 substation, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.