Skip to content
Gridcensus

NOVEC SMOKETOWN

Substation

Virginia · VIRGINIA ELECTRIC & POWER CO

Max voltage
230
kV

At a glance

NOVEC SMOKETOWN is a 230 kV electric substation in Virginia on VIRGINIA ELECTRIC & POWER CO's transmission network, recorded in the HIFLD transmission dataset. 4 transmission lines connect to it. 39 of Virginia's 529 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is BRAMBLETON in Loudoun County, with a DC Readiness score of 70/100.

NOVEC SMOKETOWN is an electric transmission substation in Virginia, on VIRGINIA ELECTRIC & POWER CO's transmission network. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership

Line owner (most lines)VIRGINIA ELECTRIC & POWER CO
Coordinates38.6416, -77.3023

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#118419230 kVVIRGINIA ELECTRIC & POWER COIN SERVICE3.7 mi
#138736230 kVVIRGINIA ELECTRIC & POWER COIN SERVICE4.5 mi
#106254115 kVVIRGINIA ELECTRIC & POWER COIN SERVICE0.0 mi
#130522115 kVVIRGINIA ELECTRIC & POWER COIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NOVEC SMOKETOWN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NOVEC SMOKETOWN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BRAMBLETONSubstation-AdjacentVALoudoun County500 kV1,000 MW5.1 yrs70.3
CLIFTONSubstation-AdjacentVAManassas Park city500 kV1,000 MW5.1 yrs69.6
MOSBYSubstation-AdjacentVAManassas Park city500 kV1,000 MW5.1 yrs69.3
OXSubstation-AdjacentVAFairfax County500 kV1,000 MW5.1 yrs69.0
BRISTERSSubstation-AdjacentVAPrince William County500 kV1,000 MW5.1 yrs68.8
UNKNOWN116662Substation-AdjacentVAStafford County500 kV1,000 MW5.1 yrs68.5
UNKNOWN116661Substation-AdjacentVAStafford County230 kV300 MW5.1 yrs68.4
CANNON BRANCHSubstation-AdjacentVAManassas city230 kV300 MW5.1 yrs67.1

How does NOVEC SMOKETOWN compare with other substations in Virginia?

Virginia has 1,382 substation records in HIFLD, of which 529 carry a station name; the rest are unnamed tap points, risers and line ends. 173 named substations in the state are in NOVEC SMOKETOWN's 230–344 kV band (33% of named stations). 39 sit in a higher band. 39 named substations in Virginia operate at 345 kV or above. The highest voltage recorded in the state is 765 kV, and the state median is 138 kV.

Who owns the transmission lines at NOVEC SMOKETOWN?

The 4 connected lines listed above are owned by VIRGINIA ELECTRIC & POWER CO. Line voltages range from 115 kV to 230 kV. Their combined recorded length is about 8.3 miles.

How do candidate sites near NOVEC SMOKETOWN score?

The 8 highest-scoring candidate sites within about 25 miles range from 67 to 70 on the 0–100 DC Readiness scale. They fall in Loudoun County, Manassas Park city, Fairfax County, Prince William County. The Virginia average across 5,871 scored sites is 52.6. 733 of those Virginia sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is NOVEC SMOKETOWN substation?

NOVEC SMOKETOWN has a maximum voltage of 230 kV and a minimum of 115 kV. That places it in the 230–344 kV band. The median named US substation in this dataset is 115 kV, so NOVEC SMOKETOWN is above the national midpoint.

How many transmission lines connect to NOVEC SMOKETOWN substation?

4 transmission lines terminate at or pass through NOVEC SMOKETOWN in the HIFLD line data. The connected lines listed here run at 230 kV, 115 kV. Together the listed lines cover about 8.3 miles.

Who owns NOVEC SMOKETOWN substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at NOVEC SMOKETOWN belong to VIRGINIA ELECTRIC & POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is NOVEC SMOKETOWN substation located?

NOVEC SMOKETOWN is in Virginia at 38.6416, -77.3023. The datacenter candidate sites closest to it are in Loudoun County, Manassas Park city, Fairfax County.

Are there datacenter candidate sites near NOVEC SMOKETOWN substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of NOVEC SMOKETOWN. The highest-scoring is BRAMBLETON at 70/100. Across Virginia, the average DC Readiness score is 52.6.

Other 230 kV substations in Virginia

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “NOVEC SMOKETOWN substation, Virginia”, https://gridcensus.com/substations/virginia/novec-smoketown-86ec7f96 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for NOVEC SMOKETOWN substation, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.