Skip to content
Gridcensus

FUDGE HOLLOW

Substation

Virginia

Max voltage
138
kV

FUDGE HOLLOW is an electric transmission substation in Virginia. It is classified as sub-transmission (138 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines5

Ownership & operation

Operator not catalogued for this substation.

Coordinates37.7801, -80.0080

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FUDGE HOLLOW, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FUDGE HOLLOW substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CLIFTON FORGESubstation-AdjacentVACovington city230 kV300 MW5.1 yrs61.4
LOWMOORSubstation-AdjacentVACovington city230 kV300 MW5.1 yrs61.3
OZ AlleghanyGreenfieldVAAlleghany——5.1 yrs57.6
Greenfield (LEXINGTON - CLOVERDALE EAST)GreenfieldMNBotetourt County500 kV1,000 MW4.7 yrs57.5
TAP147349Substation-AdjacentVACovington city138 kV100 MW5.1 yrs57.4
COVINGTONSubstation-AdjacentVACovington city138 kV100 MW5.1 yrs57.4
UNKNOWN114181Substation-AdjacentVARoanoke city138 kV100 MW5.1 yrs57.4
UNKNOWN121391Substation-AdjacentVAAlleghany County138 kV100 MW5.1 yrs57.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for FUDGE HOLLOW substation, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.