LOWMOOR
Substation-AdjacentCovington city, Virginia · PJM
LOWMOOR is a substation-adjacent datacenter candidate site in Covington city, Virginia, interconnecting through PJM. It screens at 58.2/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Covington city, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| CLIFTON FORGE | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 58.2 |
| TAP147349 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.2 |
| COVINGTON | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.2 |
| APPLIED EXTRUSION TECHNOLOGIES, INC. (PLASTICS PACKAGING FILM AND SHEET (INCLUDING LAMINATED) MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.9 |
| VIRGINIAN REVIEW (OTHER COMMERCIAL PRINTING) | Manufacturing | — | — | 3.5 yrs | 53.9 |
| MEADWESTVACO CORP., PACKAGING RESOURCES (PAPERBOARD MILLS) | Manufacturing | — | — | 3.5 yrs | 53.9 |
| MEADWESTVACO CORP. (ALL OTHER BASIC INORGANIC CHEMICAL MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.9 |
| MEADWESTVACO LATIN AMERICA (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 53.9 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen