CRAIGSVILLE

Substation

Virginia · VIRGINIA ELECTRIC & POWER CO

Max voltage
—
kV

At a glance

CRAIGSVILLE is an electric substation in Virginia on VIRGINIA ELECTRIC & POWER CO's transmission network, recorded in the HIFLD transmission dataset. 2 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is LEXINGTON in Rockbridge County, with a DC Readiness score of 65/100.

CRAIGSVILLE is an electric transmission substation in Virginia, on VIRGINIA ELECTRIC & POWER CO's transmission network. It is classified as unclassified and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines2

Ownership

Line owner (most lines)VIRGINIA ELECTRIC & POWER CO
Coordinates38.0829, -79.3848

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#148101—VIRGINIA ELECTRIC & POWER CO—4.2 mi
#150197—VIRGINIA ELECTRIC & POWER COIN SERVICE10.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CRAIGSVILLE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CRAIGSVILLE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LEXINGTONSubstation-AdjacentVARockbridge County500 kV1,000 MW5.1 yrs64.8
WEST STAUNTONSubstation-AdjacentVAAugusta County230 kV300 MW5.1 yrs60.7
OZ StauntonGreenfieldVAStaunton——5.1 yrs58.3
BUENA VISTASubstation-AdjacentVABuena Vista city115 kV100 MW5.1 yrs57.8
STAUNTONSubstation-AdjacentVAStaunton city115 kV100 MW5.1 yrs57.8
TAP161412Substation-AdjacentVABuena Vista city115 kV100 MW5.1 yrs57.8
VERONASubstation-AdjacentVAStaunton city115 kV100 MW5.1 yrs57.7
ROCKBRIDGESubstation-AdjacentVALexington city115 kV100 MW5.1 yrs57.6

Who owns the transmission lines at CRAIGSVILLE?

The 2 connected lines listed above are owned by VIRGINIA ELECTRIC & POWER CO. Their combined recorded length is about 15.1 miles.

How do candidate sites near CRAIGSVILLE score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 65 on the 0–100 DC Readiness scale. They fall in Rockbridge County, Augusta County, Staunton, Buena Vista city. The Virginia average across 5,871 scored sites is 52.6. 733 of those Virginia sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to CRAIGSVILLE substation?

2 transmission lines terminate at or pass through CRAIGSVILLE in the HIFLD line data. Together the listed lines cover about 15.1 miles.

Who owns CRAIGSVILLE substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at CRAIGSVILLE belong to VIRGINIA ELECTRIC & POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is CRAIGSVILLE substation located?

CRAIGSVILLE is in Virginia at 38.0829, -79.3848. The datacenter candidate sites closest to it are in Rockbridge County, Augusta County, Staunton.

Are there datacenter candidate sites near CRAIGSVILLE substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of CRAIGSVILLE. The highest-scoring is LEXINGTON at 65/100. Across Virginia, the average DC Readiness score is 52.6.

More in Virginia

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “CRAIGSVILLE substation, Virginia”, https://gridcensus.com/substations/virginia/craigsville-89277d88 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for CRAIGSVILLE substation, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.